IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0960 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $10,808 $0 Implemented
UD0960 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,390 $1,000 Implemented
UD0960 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,273 $0 Implemented
UD0960 # 06 Y:2017 06 2017 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $514 $1,425 Implemented
UD0960 # 07 Y:2017 07 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,266 $3,000 Not Implemented
UD0960 # 08 Y:2017 08 2017 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $11,351 $10,000 Not Implemented
UD0960 # 09 Y:2017 09 2017 REDUCE EXCESSIVE BOILER BLOWDOWN $5,234 $7,500 Not Implemented
UD0960 # 10 Y:2017 10 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,121 $0 Not Implemented
UD0960 # 11 Y:2017 11 2017 USE MINIMUM STEAM OPERATING PRESSURE $826 $0 Not Implemented
UD0960 # 12 Y:2017 12 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,179 $97,386 Not Implemented
UD0960 # 13 Y:2017 13 2017 INSTALL OCCUPANCY SENSORS $6,486 $9,108 Not Implemented
UD0960 # 14 Y:2017 14 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,599 $9,362 Not Implemented
UD0959 # 01 Y:2017 01 2017 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $114,753 $0 Not Implemented
UD0959 # 02 Y:2017 02 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $19,894 $39,000 Not Implemented
UD0959 # 03 Y:2017 03 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,841 $0 Not Implemented
UD0959 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,612 $68,240 Not Implemented
UD0959 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $14,215 $15,000 Not Implemented
UD0959 # 06 Y:2017 06 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,843 $0 Implemented
UD0959 # 07 Y:2017 07 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,881 $10,000 Implemented
UD0959 # 08 Y:2017 08 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,551 $1,000 Not Implemented
UD0959 # 09 Y:2017 09 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $78 $0 Implemented
UD0959 # 10 Y:2017 10 2017 REDUCE VENTILATION AIR $19,897 $10,500 Not Implemented
UD0959 # 11 Y:2017 11 2017 USE RADIANT HEATER FOR SPOT HEATING $6,411 $23,750 Not Implemented
UD0959 # 12 Y:2017 12 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,300 $0 Not Implemented
UD0959 # 13 Y:2017 13 2017 INSTALL OCCUPANCY SENSORS $14,374 $25,987 Not Implemented