IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0386 # 10 Y:2014 10 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,010 $6,000 Not Implemented
LE0384 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,262 $250 Not Implemented
LE0384 # 02 Y:2014 02 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,272 $1,481 Implemented
LE0384 # 03 Y:2014 03 2014 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,284 $1,010 Not Implemented
LE0384 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,878 $2,080 Not Implemented
LE0384 # 05 Y:2014 05 2014 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $46,884 $80,000 Not Implemented
LE0384 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,875 $3,304 Implemented
LE0384 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,620 $12,950 Implemented
LE0384 # 08 Y:2014 08 2014 INSTALL TIMERS AND/OR THERMOSTATS $3,342 $234 Implemented
LE0384 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,397 $30,000 Implemented
LE0384 # 10 Y:2014 10 2014 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $7,346 $551,550 Implemented
LE0383 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,489 $40 Implemented
LE0383 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,539 $300 Implemented
LE0383 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $817 $220 Not Implemented
LE0383 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,956 $15,120 Not Implemented
LE0383 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,869 $5,500 Not Implemented
LE0383 # 06 Y:2014 06 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $18,711 $69,360 Not Implemented
LE0383 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,230 $63,360 Not Implemented
WV0492 # 01 Y:2014 01 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,061 $1,700 Implemented
WV0492 # 02 Y:2014 02 2014 COVER OPEN TANKS $7,268 $1,145 Implemented
WV0492 # 03 Y:2014 03 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $6,370 $0 Not Implemented
WV0492 # 04 Y:2014 04 2014 USE RADIANT HEATER FOR SPOT HEATING $5,334 $11,360 Not Implemented
WV0492 # 05 Y:2014 05 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,126 $3,000 Implemented
WV0492 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,774 $8,160 Implemented
WV0492 # 07 Y:2014 07 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,914 $1,000 Implemented