IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,767

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0078 # 02 Y:2011 02 2011 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $10,364 $5,531 Not Implemented
TT0078 # 03 Y:2011 03 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,023 $1,480 Implemented
TT0078 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,720 $800 Implemented
TT0078 # 05 Y:2011 05 2011 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $15,241 $12,500 Not Implemented
TT0071 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,100 $66,100 Implemented
TT0071 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,400 $52,100 Implemented
TT0071 # 03 Y:2011 03 2011 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $13,100 $8,000 Not Implemented
TT0071 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,700 $5 Implemented
TT0071 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,900 $5,000 Not Implemented
TT0071 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $4,600 $3,000 Not Implemented
TT0071 # 07 Y:2011 07 2011 UPGRADE CONTROLS ON COMPRESSORS $4,400 $9,000 Not Implemented
TT0074 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,855 $61,400 Implemented
TT0074 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,100 $5,000 Implemented
TT0074 # 03 Y:2011 03 2011 INSULATE BARE EQUIPMENT $48,800 $37,500 Implemented
TT0074 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,250 $7,500 Not Implemented
TT0074 # 05 Y:2011 05 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $52,200 $95,100 Not Implemented
TT0074 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $6,100 $12,000 Not Implemented
TT0074 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $10,300 $21,000 Not Implemented
TT0066 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,900 $7,100 Not Implemented
TT0066 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,500 $6,200 Not Implemented
TT0066 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,800 $5,700 Not Implemented
TT0066 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,000 $41,100 Not Implemented
TT0066 # 05 Y:2011 05 2011 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,200 $600 Not Implemented
TT0066 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $140 $30 Implemented
TT0066 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,900 $5,000 Not Implemented