IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,998

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0282 # 05 Y:1986 05 1986 HEAT WATER WITH EXHAUST HEAT $4,519 $16,000 Not Implemented
LT0053 # 01 Y:1986 01 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,910 $0 Implemented
LT0053 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $575 $0 Implemented
LT0053 # 03 Y:1986 03 1986 USE OPTIMUM THICKNESS INSULATION $11,458 $28,763 Not Implemented
LT0053 # 05 Y:1986 05 1986 REPAIR AND ELIMINATE STEAM LEAKS $2,214 $2,000 Implemented
LT0053 # 06 Y:1986 06 1986 KEEP BOILER TUBES CLEAN $1,737 $3,000 Not Implemented
LT0053 # 07 Y:1986 07 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,600 $10,000 Not Implemented
LT0053 # 08 Y:1986 08 1986 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $408 $1,000 Implemented
LT0055 # 01 Y:1986 01 1986 INSULATE BARE EQUIPMENT $287 $270 Implemented
LT0055 # 02 Y:1986 02 1986 INSULATE BARE EQUIPMENT $219 $360 Not Implemented
LT0055 # 03 Y:1986 03 1986 USE OPTIMUM THICKNESS INSULATION $4,130 $5,659 Implemented
LT0055 # 04 Y:1986 04 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,226 $1,220 Not Implemented
LT0055 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $278 $129 Not Implemented
LT0055 # 06 Y:1986 06 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,847 $16,480 Implemented
LT0055 # 07 Y:1986 07 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $130 $71 Not Implemented
LT0056 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $201 $300 Implemented
LT0056 # 02 Y:1986 02 1986 SHUT OFF PILOTS IN STANDBY EQUIPMENT $74 $130 Not Implemented
LT0056 # 03 Y:1986 03 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $787 $197 Implemented
LT0056 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $231 $160 Implemented
LT0056 # 05 Y:1986 05 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $232 $225 Implemented
LT0056 # 06 Y:1986 06 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $643 $84 Implemented
MA0057 # 01 Y:1986 01 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,191 $2,500 Implemented
MA0057 # 02 Y:1986 02 1986 REDUCE GLAZED AREAS IN BUILDINGS $3,959 $8,455 Implemented
MA0057 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $377 $300 Implemented
MA0057 # 04 Y:1986 04 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,512 $0 Not Implemented