IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0230 # 05 Y:1995 05 1995 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $564 $650 Implemented
ND0230 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57 $450 Not Implemented
BD0039 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,365 $16,630 Implemented
BD0039 # 02 Y:1995 02 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,955 $2,000 Implemented
BD0039 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,953 $1,000 Implemented
BD0039 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $3,985 $825 Implemented
BD0039 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $723 $571 Implemented
BD0039 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $182 $305 Implemented
UD0469 # 01 Y:1995 01 1995 COMBINE UTILITY METERS $3,256 $0 Implemented
UD0469 # 02 Y:1995 02 1995 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,980 $3,000 Not Implemented
UD0469 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $227 $392 Implemented
UD0469 # 04 Y:1995 04 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,522 $1,000 Not Implemented
UD0469 # 05 Y:1995 05 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,600 $20,000 Not Implemented
SF0069 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,195 $1,746 n/a
SF0069 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,404 $4,680 n/a
SF0069 # 03 Y:1995 03 1995 USE PHOTOCELL CONTROLS $1,710 $3,150 n/a
SF0069 # 04 Y:1995 04 1995 OPTIMIZE PLANT POWER FACTOR $2,222 $3,227 n/a
SF0069 # 05 Y:1995 05 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,877 $94,943 n/a
SF0069 # 06 Y:1995 06 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $831 $1,380 n/a
SF0069 # 07 Y:1995 07 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $565 $0 n/a
SF0069 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,592 $0 n/a
SF0069 # 09 Y:1995 09 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,744 $3,255 n/a
SF0069 # 10 Y:1995 10 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,210 $854 n/a
UL0135 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,519 $40 Not Implemented
UL0135 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,179 $30 Not Implemented