Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0389 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $310 | $506 | Not Implemented |
AS0389 # 04 Y:2004 | 04 | 2004 | USE GRAVITY FEEDS WHEREVER POSSIBLE | $345 | $150 | Not Implemented |
AS0389 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,971 | $7,343 | Implemented |
MI0093 # 01 Y:2004 | 01 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,620 | $0 | Not Implemented |
MI0093 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $44,199 | $0 | Not Implemented |
MI0093 # 03 Y:2004 | 03 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $553 | $0 | Not Implemented |
MI0093 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,800 | $0 | Not Implemented |
MI0093 # 05 Y:2004 | 05 | 2004 | INCREASE USE OF AUTOMATION | $28,521 | $0 | Not Implemented |
MI0093 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,994 | $0 | Not Implemented |
MI0093 # 07 Y:2004 | 07 | 2004 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $8,755 | $510 | Implemented |
MI0093 # 08 Y:2004 | 08 | 2004 | INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES | $23,333 | $21,000 | Implemented |
MI0093 # 09 Y:2004 | 09 | 2004 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $12,561 | $0 | Not Implemented |
MS0259 # 01 Y:2004 | 01 | 2004 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $111,932 | $0 | Not Implemented |
MS0259 # 02 Y:2004 | 02 | 2004 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $48,984 | $0 | Not Implemented |
MS0259 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,687 | $150 | Implemented |
MS0259 # 04 Y:2004 | 04 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,622 | $0 | Not Implemented |
MS0259 # 05 Y:2004 | 05 | 2004 | HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE | $6,267 | $18,138 | Not Implemented |
MS0259 # 06 Y:2004 | 06 | 2004 | HEAT WATER WITH EXHAUST HEAT | $5,972 | $0 | Implemented |
MS0259 # 07 Y:2004 | 07 | 2004 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,481 | $245,000 | Implemented |
MS0259 # 08 Y:2004 | 08 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,277 | $0 | Implemented |
MS0259 # 09 Y:2004 | 09 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $2,598 | $0 | Not Implemented |
MS0259 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,655 | $0 | Not Implemented |
MA0560 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $42,752 | $238,150 | Implemented |
MA0560 # 02 Y:2004 | 02 | 2004 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $32,756 | $23,710 | Implemented |
MA0560 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,875 | $1,200 | Implemented |