IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0278 # 10 Y:2007 10 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $583 $668 Not Implemented
LL0278 # 11 Y:2007 11 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $203 $120 Implemented
MI0152 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,769 $1,074 Implemented
LE0258 # 01 Y:2007 01 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,092 $6,400 Not Implemented
LE0258 # 02 Y:2007 02 2007 USE RADIANT HEATER FOR SPOT HEATING $12,411 $18,750 Not Implemented
LE0258 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,871 $10,000 Not Implemented
LE0258 # 04 Y:2007 04 2007 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,874 $5,000 Not Implemented
LE0258 # 05 Y:2007 05 2007 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $767 $150 Not Implemented
LE0258 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,367 $40,684 Not Implemented
LE0258 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $387 $1,400 Not Implemented
LL0278 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,656 $10,860 Implemented
LL0278 # 02 Y:2007 02 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $14,779 $1,384 Not Implemented
LL0278 # 03 Y:2007 03 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $9,981 $150 Implemented
LL0278 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,854 $2,400 Implemented
LL0278 # 05 Y:2007 05 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,388 $542 Implemented
LL0278 # 06 Y:2007 06 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,920 $1,147 Implemented
LL0278 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,744 $1,050 Implemented
LL0278 # 08 Y:2007 08 2007 INSULATE BARE EQUIPMENT $1,696 $912 Implemented
LL0278 # 09 Y:2007 09 2007 INSULATE BARE EQUIPMENT $1,240 $428 Not Implemented
MI0151 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $46,436 $1,955 Not Implemented
MI0151 # 02 Y:2007 02 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $67,528 $120 Implemented
MI0151 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,594 $20,498 Implemented
MI0151 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,109 $1,074 Implemented
MI0151 # 05 Y:2007 05 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,528 $3,010 Not Implemented
MI0151 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,331 $30 Not Implemented