IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,880

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT8380 # 04 Y:2023 04 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $17,700 $1,500 n/a
IC0289 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,395 $19,066 Implemented
IC0289 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $9,069 $7,303 Implemented
IC0289 # 03 Y:2023 03 2023 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,672 $0 Not Implemented
IC0289 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $43,347 $366,628 Not Implemented
IC0289 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $21,396 $151,345 Not Implemented
CI0019 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $70,514 $548,740 n/a
CI0019 # 02 Y:2023 02 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $42,450 $24,000 n/a
CI0019 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,792 $2,500 n/a
CI0019 # 04 Y:2023 04 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,992 $8,890 n/a
CI0019 # 05 Y:2023 05 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,769 $3,500 n/a
CI0019 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,444 $200 n/a
CI0019 # 07 Y:2023 07 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,159 $1,500 n/a
CI0019 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $851 $1,500 n/a
CM1021 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $90,579 $941,260 n/a
CM1021 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $2,426 $981 n/a
CM1021 # 03 Y:2023 03 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $427 $730 n/a
CM1021 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,522 $4,636 n/a
CM1021 # 05 Y:2023 05 2023 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $18,330 $246,610 n/a
CM1021 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $34,069 $800 n/a
LS1423 # 01 Y:2023 01 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,322 $0 Implemented
LS1423 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $6,320 $540 Not Implemented
LS1423 # 03 Y:2023 03 2023 REDUCE HEAT GAIN BY WINDOW TINTING $5,029 $1,176 Not Implemented
LS1423 # 04 Y:2023 04 2023 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $259 $125 Implemented
LS1423 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $277 $200 Implemented