Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
162,429
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0078 # 06 Y:1986 | 06 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,730 | $1,000 | Not Implemented |
CO0078 # 07 Y:1986 | 07 | 1986 | REDESIGN PROCESS | $112,427 | $120,000 | Not Implemented |
CO0079 # 01 Y:1986 | 01 | 1986 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $1,207,312 | $5,000,000 | Not Implemented |
CO0079 # 02 Y:1986 | 02 | 1986 | IMPROVE LUBRICATION PRACTICES | $56,931 | $0 | Implemented |
CO0079 # 03 Y:1986 | 03 | 1986 | INSULATE BARE EQUIPMENT | $43,492 | $37,500 | Not Implemented |
CO0079 # 04 Y:1986 | 04 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $26,207 | $7,000 | Implemented |
CO0079 # 05 Y:1986 | 05 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $13,012 | $12,000 | Implemented |
CO0079 # 06 Y:1986 | 06 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $3,423 | $46 | Implemented |
CO0079 # 07 Y:1986 | 07 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,097 | $3,098 | Implemented |
CO0079 # 08 Y:1986 | 08 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,816 | $1,000 | Implemented |
GT0305 # 01 Y:1986 | 01 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $771 | $919 | Implemented |
GT0305 # 02 Y:1986 | 02 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,192 | $6,512 | Implemented |
GT0305 # 03 Y:1986 | 03 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,049 | $2,100 | Implemented |
GT0305 # 04 Y:1986 | 04 | 1986 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $9,350 | $0 | Implemented |
GT0305 # 05 Y:1986 | 05 | 1986 | ADJUST VENTS TO MINIMIZE ENERGY USE | $3,652 | $1,000 | Not Implemented |
GT0305 # 06 Y:1986 | 06 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,580 | $0 | Implemented |
GT0305 # 07 Y:1986 | 07 | 1986 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $24,800 | $49,200 | Not Implemented |
GT0305 # 08 Y:1986 | 08 | 1986 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $4,400 | $1,000 | Implemented |
MA0077 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $659 | $212 | Not Implemented |
MA0077 # 02 Y:1986 | 02 | 1986 | INSTALL / REPAIR INSULATION ON STEAM LINES | $370 | $753 | Not Implemented |
MA0077 # 03 Y:1986 | 03 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,888 | $4,650 | Not Implemented |
MA0077 # 04 Y:1986 | 04 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,705 | $7,200 | Not Implemented |
MA0077 # 05 Y:1986 | 05 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $17,850 | $22,500 | Not Implemented |
MA0077 # 06 Y:1986 | 06 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $580 | $40 | Not Implemented |
MA0077 # 07 Y:1986 | 07 | 1986 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $1,650 | $907 | Not Implemented |