IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159,879

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0169 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,315 $178 Implemented
UD0169 # 03 Y:1985 03 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $849 $0 Implemented
UD0170 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,355 $1,543 Implemented
TS0024 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,555 $25 Not Implemented
TS0024 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $842 $214 Not Implemented
TS0024 # 03 Y:1985 03 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $168 $105 Not Implemented
TS0024 # 04 Y:1985 04 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,617 $4,028 Not Implemented
TS0024 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,293 $3,000 Not Implemented
TS0024 # 06 Y:1985 06 1985 INSTALL STORM WINDOWS AND DOORS $281 $140 Not Implemented
TS0030 # 01 Y:1985 01 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $50,700 $500 Not Implemented
TS0030 # 02 Y:1985 02 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,867 $2,550 Not Implemented
TS0030 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,867 $100 Not Implemented
TS0030 # 04 Y:1985 04 1985 AIR CONDITION ONLY SPACE NECESSARY $3,209 $75 Not Implemented
GT0257 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $860 $400 Implemented
GT0257 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $122 $16 Not Implemented
GT0257 # 03 Y:1985 03 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $224 $275 Not Implemented
GT0262 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,780 $500 Implemented
GT0262 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $92 $27 Implemented
GT0262 # 03 Y:1985 03 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $165 $168 Implemented
GT0262 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $468 $75 Implemented
CO0033 # 01 Y:1985 01 1985 REDUCE VENTILATION AIR $27,000 $399 Implemented
CO0033 # 02 Y:1985 02 1985 REDUCE VENTILATION AIR $7,279 $824 Implemented
CO0033 # 03 Y:1985 03 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,343 $4,000 Implemented
CO0033 # 04 Y:1985 04 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,584 $3,500 Not Implemented
CO0033 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $655 $3,000 Implemented