Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0771 # 07 Y:2008 | 07 | 2008 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,068 | $200 | Not Implemented |
OK0769 # 01 Y:2008 | 01 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $53,558 | $2,347 | Not Implemented |
OK0769 # 02 Y:2008 | 02 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $18,368 | $731 | Not Implemented |
OK0769 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $788 | $1,922 | Implemented |
OK0769 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $98,641 | $246,228 | Not Implemented |
OK0769 # 05 Y:2008 | 05 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,911 | $4,475 | Implemented |
OK0769 # 06 Y:2008 | 06 | 2008 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,068 | $200 | Not Implemented |
OK0769 # 07 Y:2008 | 07 | 2008 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $451,827 | $2,500,000 | Not Implemented |
OK0766 # 01 Y:2008 | 01 | 2008 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $4,948 | $775 | Implemented |
OK0766 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,063 | $0 | Implemented |
OK0766 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $475 | $1,937 | Implemented |
OK0766 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,350 | $11,729 | Not Implemented |
OK0766 # 05 Y:2008 | 05 | 2008 | Install Anaerobic Digester | $304,567 | $240,000 | Not Implemented |
OK0765 # 01 Y:2008 | 01 | 2008 | INSTALL OCCUPANCY SENSORS | $1,794 | $2,151 | Not Implemented |
OK0765 # 02 Y:2008 | 02 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $340 | $0 | Implemented |
OK0765 # 03 Y:2008 | 03 | 2008 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,600 | $0 | Not Implemented |
OK0765 # 04 Y:2008 | 04 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,176 | $4,690 | Not Implemented |
OK0765 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,974 | $18,623 | Implemented |
OK0765 # 06 Y:2008 | 06 | 2008 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $42,105 | $161,000 | Implemented |
OK0764 # 01 Y:2008 | 01 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,109 | $5,086 | Not Implemented |
OK0764 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,596 | $14,878 | Not Implemented |
OK0764 # 03 Y:2008 | 03 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $477 | $1,165 | Not Implemented |
OK0764 # 04 Y:2008 | 04 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $22,038 | $14,300 | Not Implemented |
OK0764 # 05 Y:2008 | 05 | 2008 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $7,000 | $0 | Not Implemented |
OK0764 # 06 Y:2008 | 06 | 2008 | CLOSE OFF UNNEEDED STEAM LINES | $7,161 | $0 | Not Implemented |