Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,767
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0065 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,010 | $5,000 | Not Implemented |
TT0065 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,300 | $32,200 | Not Implemented |
TT0065 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,600 | $109,700 | Not Implemented |
TT0065 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,200 | $3,700 | Not Implemented |
TT0065 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,000 | $12,200 | Implemented |
TT0065 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,990 | $5,000 | Implemented |
TT0065 # 07 Y:2011 | 07 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,600 | $10,000 | Not Implemented |
TT0065 # 08 Y:2011 | 08 | 2011 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $20,800 | $22,000 | Not Implemented |
TT0065 # 09 Y:2011 | 09 | 2011 | INSULATE BARE EQUIPMENT | $65,500 | $61,500 | Implemented |
TT0073 # 01 Y:2011 | 01 | 2011 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $13,566 | $9,650 | Implemented |
TT0068 # 01 Y:2011 | 01 | 2011 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $15,000 | $300,000 | Not Implemented |
TT0069 # 01 Y:2011 | 01 | 2011 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,768 | $0 | Not Implemented |
TT0069 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,271 | $3,600 | Not Implemented |
TT0069 # 03 Y:2011 | 03 | 2011 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $549 | $600 | Not Implemented |
TT0069 # 04 Y:2011 | 04 | 2011 | OPTIMIZE PLANT POWER FACTOR | $985 | $1,980 | Not Implemented |
TT0069 # 05 Y:2011 | 05 | 2011 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $2,083 | $4,900 | Not Implemented |
TT0067 # 01 Y:2011 | 01 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $303,919 | $125,000 | Not Implemented |
TT0064 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,600 | $2,500 | Implemented |
TT0064 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,400 | $26,700 | Implemented |
TT0064 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $957 | $4,000 | Implemented |
TT0064 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $414 | $3,200 | Implemented |
TT0064 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,844 | $29,100 | Implemented |
TT0064 # 06 Y:2011 | 06 | 2011 | OPTIMIZE PLANT POWER FACTOR | $7,300 | $8,500 | Implemented |
TT0064 # 07 Y:2011 | 07 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $37,600 | $5,500 | Implemented |
TT0064 # 08 Y:2011 | 08 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,800 | $5,000 | Implemented |