IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,500

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0121 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $365 $220 Implemented
OD0121 # 05 Y:1998 05 1998 REPAIR OR REPLACE STEAM TRAPS $672 $110 Implemented
OD0121 # 06 Y:1998 06 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,833 $1,495 Implemented
OD0121 # 07 Y:1998 07 1998 INSTALL STEAM TRAP $1,445 $560 Not Implemented
OD0121 # 08 Y:1998 08 1998 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $10,017 $2,800 Implemented
OD0120 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,685 $5,673 Not Implemented
OD0120 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $855 $1,322 Not Implemented
OD0120 # 03 Y:1998 03 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $465 $420 Not Implemented
OD0120 # 04 Y:1998 04 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $246,500 $180,480 Implemented
NC0150 # 01 Y:1998 01 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $920 $400 Not Implemented
NC0150 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,383 $819 Not Implemented
NC0150 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $729 $1,532 Not Implemented
NC0150 # 04 Y:1998 04 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $244 $800 Implemented
NC0150 # 05 Y:1998 05 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,244 $4,400 Implemented
NC0150 # 06 Y:1998 06 1998 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $14,434 $500 Not Implemented
NC0150 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $45,216 $16,000 Not Implemented
OD0117 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,497 $7,621 Not Implemented
OD0117 # 02 Y:1998 02 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $127 $608 Implemented
OD0117 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,198 $920 Implemented
OD0117 # 04 Y:1998 04 1998 INSTALL OCCUPANCY SENSORS $375 $100 Implemented
OD0117 # 05 Y:1998 05 1998 METER WASTE WATER $6,227 $4,595 Implemented
OD0117 # 06 Y:1998 06 1998 PAY BILLS ON TIME TO AVOID LATE FEES $5,823 $0 Implemented
OD0116 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,986 $1,615 Not Implemented
OD0116 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $925 $2,175 Implemented
OD0116 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $921 $800 Implemented