Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,777
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0378 # 04 Y:1992 | 04 | 1992 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $13,114 | $14,400 | Implemented |
UF0039 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,148 | $408 | Implemented |
UF0039 # 02 Y:1992 | 02 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $462 | $2,465 | Implemented |
UF0039 # 03 Y:1992 | 03 | 1992 | INSTALL SPECTRAL REFLECTORS / DELAMP | $3,902 | $12,240 | Not Implemented |
UF0039 # 04 Y:1992 | 04 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $22,821 | $0 | Implemented |
UF0039 # 05 Y:1992 | 05 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,260 | $55,871 | Implemented |
UF0039 # 06 Y:1992 | 06 | 1992 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $18,660 | $105,000 | Not Implemented |
UF0039 # 07 Y:1992 | 07 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,188 | $1,000 | Not Implemented |
UF0040 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,040 | $365 | Not Implemented |
UF0040 # 02 Y:1992 | 02 | 1992 | INSTALL SPECTRAL REFLECTORS / DELAMP | $7,069 | $10,950 | Not Implemented |
UF0040 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $434 | $1,949 | Not Implemented |
UF0040 # 04 Y:1992 | 04 | 1992 | AIR CONDITION ONLY SPACE NECESSARY | $548 | $1,000 | Not Implemented |
UF0040 # 05 Y:1992 | 05 | 1992 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $1,228 | $6,425 | Not Implemented |
UF0040 # 06 Y:1992 | 06 | 1992 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,115 | $17,600 | Not Implemented |
UF0040 # 07 Y:1992 | 07 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,149 | $14,859 | Not Implemented |
UF0041 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,221 | $798 | Implemented |
UF0041 # 02 Y:1992 | 02 | 1992 | INSTALL SPECTRAL REFLECTORS / DELAMP | $4,215 | $11,940 | Not Implemented |
UF0041 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $182 | $1,863 | Not Implemented |
UF0041 # 04 Y:1992 | 04 | 1992 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $400 | $1,200 | Implemented |
UF0041 # 05 Y:1992 | 05 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $775 | $7,950 | Implemented |
UF0041 # 06 Y:1992 | 06 | 1992 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $125 | $660 | Implemented |
UF0041 # 07 Y:1992 | 07 | 1992 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,204 | $4,750 | Not Implemented |
UF0041 # 08 Y:1992 | 08 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $583 | $0 | Not Implemented |
OK0387 # 01 Y:1992 | 01 | 1992 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $20,408 | $1,580 | Implemented |
OK0387 # 02 Y:1992 | 02 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,003 | $8,297 | Not Implemented |