IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0711 # 01 Y:2016 01 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $62,500 $108,300 Not Implemented
AM0711 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,350 $57,195 Implemented
AM0711 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,630 $9,030 Implemented
AM0711 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $18,515 $60,200 Not Implemented
AM0711 # 05 Y:2016 05 2016 REPAIR AND ELIMINATE STEAM LEAKS $17,450 $26 Not Implemented
AM0711 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,000 $13 Not Implemented
AM0711 # 07 Y:2016 07 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,344 $2,620 Not Implemented
AM0711 # 08 Y:2016 08 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,880 $0 Implemented
AM0711 # 09 Y:2016 09 2016 USE SYNTHETIC LUBRICANT $1,072 $0 Not Implemented
AM0711 # 10 Y:2016 10 2016 PAY BILLS ON TIME TO AVOID LATE FEES $471 $0 Not Implemented
SU0415 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $335 $0 Not Implemented
SU0415 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $121 $157 Implemented
SU0415 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,422 $27,505 Implemented
SU0415 # 04 Y:2016 04 2016 REPLACE BOILER $5,067 $23,111 Implemented
BS0077 # 01 Y:2016 01 2016 REDUCE HEAT GAIN BY WINDOW TINTING $1,622 $2,644 Not Implemented
BS0077 # 02 Y:2016 02 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $698 $505 Implemented
BS0077 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $711 $960 Implemented
BS0077 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,328 $3,080 Implemented
BS0077 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $141 $530 Not Implemented
BS0077 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $370 $15 Implemented
BS0077 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $118 $47 Implemented
BS0077 # 08 Y:2016 08 2016 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $117 $340 Not Implemented
BS0077 # 09 Y:2016 09 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $167 $400 Implemented
IA0559 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,263 $19,592 Not Implemented
IA0559 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,791 $384 Not Implemented