IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,855

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0180 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $781 $186 Implemented
OK0180 # 05 Y:1985 05 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,770 $4,400 Implemented
OK0180 # 06 Y:1985 06 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,695 $2,100 Implemented
OK0180 # 07 Y:1985 07 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,381 $29,961 Implemented
OK0182 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $225 $310 Implemented
OK0182 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,969 $7,785 Not Implemented
OK0182 # 03 Y:1985 03 1985 INSTALL SET-BACK TIMERS $119 $225 Not Implemented
OK0182 # 04 Y:1985 04 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,756 $6,480 Not Implemented
OK0182 # 05 Y:1985 05 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $680 $325 Implemented
PV0005 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $437 $17 Not Implemented
PV0005 # 02 Y:1985 02 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,834 $0 Not Implemented
PV0006 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $175 $0 Not Implemented
PV0006 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $85 $0 Not Implemented
KU0168 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,947 $125 Implemented
KU0168 # 02 Y:1985 02 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $842 $200 Not Implemented
KU0168 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68 $912 Not Implemented
KU0168 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $140 $0 Not Implemented
KU0169 # 01 Y:1985 01 1985 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $1,536,415 $7,700,000 Not Implemented
KU0169 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $48,005 $6,000 Implemented
KU0169 # 03 Y:1985 03 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,083 $5,000 Implemented
KU0169 # 04 Y:1985 04 1985 OPTIMIZE PLANT POWER FACTOR $7,711 $37,000 Implemented
KU0169 # 05 Y:1985 05 1985 INSTALL SET-BACK TIMERS $8,360 $622 Implemented
KU0169 # 06 Y:1985 06 1985 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $7,219 $13,000 Implemented
KU0169 # 07 Y:1985 07 1985 INSTALL AUTOMATIC STACK DAMPER $4,581 $1,700 Implemented
KU0169 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,579 $0 Implemented