IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,855

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AT0008 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,812 $150 Implemented
AT0008 # 02 Y:1985 02 1985 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $128 $222 Not Implemented
AT0008 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $251 $173 Not Implemented
AT0008 # 04 Y:1985 04 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,560 $1,050 Not Implemented
GT0252 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,225 $500 Implemented
GT0252 # 02 Y:1985 02 1985 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $9,800 $41,660 Not Implemented
GT0252 # 03 Y:1985 03 1985 KEEP BOILER TUBES CLEAN $3,730 $5,000 Implemented
GT0252 # 04 Y:1985 04 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,283 $2,928 Implemented
GT0252 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,220 $4,800 Implemented
GT0252 # 06 Y:1985 06 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,490 $0 Implemented
GT0252 # 07 Y:1985 07 1985 RECOVER WASTE HEAT FROM EQUIPMENT $12,650 $10,000 Not Implemented
GT0254 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $944 $617 Implemented
GT0254 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $732 $230 Implemented
GT0254 # 03 Y:1985 03 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,500 $75,000 Implemented
GT0254 # 04 Y:1985 04 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $39,300 $25,000 Implemented
GT0256 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $329 $330 Implemented
GT0256 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $195 $75 Not Implemented
GT0256 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $500 Not Implemented
GT0256 # 04 Y:1985 04 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $709 $0 Not Implemented
GT0256 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,330 $640 Implemented
GT0256 # 06 Y:1985 06 1985 INSULATE BARE EQUIPMENT $11,900 $9,650 Implemented
GT0256 # 07 Y:1985 07 1985 USE MINIMUM SAFE OVEN VENTILATION $16,700 $1,000 Not Implemented
TS0023 # 01 Y:1985 01 1985 OPTIMIZE PLANT POWER FACTOR $1,342 $4,400 Not Implemented
TS0023 # 02 Y:1985 02 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,162 $0 Not Implemented
TS0023 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $928 $0 Not Implemented