IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0485 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $23,640 $18,000 Implemented
CO0485 # 06 Y:2001 06 2001 OPTIMIZE PLANT POWER FACTOR $6,730 $23,000 Not Implemented
CO0485 # 07 Y:2001 07 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,600 $5,980 Implemented
CO0485 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,680 $8,380 Implemented
CO0485 # 09 Y:2001 09 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,370 $2,340 Implemented
CO0485 # 10 Y:2001 10 2001 AUTOMATE FINISHING PROCESS $112,750 $100,000 Implemented
AM0401 # 01 Y:2001 01 2001 REPAIR OR REPLACE STEAM TRAPS $147,000 $800 Implemented
AM0401 # 02 Y:2001 02 2001 USE SYNTHETIC LUBRICANT $76,500 $0 Not Implemented
AM0401 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $46,800 $1,400 Implemented
AM0401 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,020 $119,000 n/a
AM0401 # 05 Y:2001 05 2001 OPTIMIZE PLANT POWER FACTOR $13,200 $28,000 n/a
AM0401 # 06 Y:2001 06 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,300 $0 Implemented
AM0401 # 07 Y:2001 07 2001 REPAIR AND ELIMINATE STEAM LEAKS $3,400 $1,000 Implemented
AM0401 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,170 $700 Not Implemented
UU0002 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,263 $700 Implemented
UU0002 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,384 $950 Not Implemented
UU0002 # 03 Y:2001 03 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,066 $1,066 Not Implemented
UU0002 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $254 $1,097 Implemented
UU0002 # 05 Y:2001 05 2001 PAY BILLS ON TIME TO AVOID LATE FEES $1,040 $0 Implemented
UU0001 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $177 $107 Not Implemented
UU0001 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,462 $300 Implemented
UU0001 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $265 $837 Not Implemented
UU0001 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,268 $2,762 Not Implemented
UU0001 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $161 $156 Not Implemented
UU0001 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $947 $0 Implemented