IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,377

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0024 # 07 Y:1985 07 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,678 $0 Implemented
ST0024 # 08 Y:1985 08 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,190 $1,428 Not Implemented
ST0024 # 09 Y:1985 09 1985 INSULATE BARE EQUIPMENT $44 $26 Implemented
ST0024 # 10 Y:1985 10 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,186 $1,900 Implemented
ST0024 # 11 Y:1985 11 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,038 $2,186 Implemented
ST0024 # 12 Y:1985 12 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,820 $0 Not Implemented
ST0024 # 13 Y:1985 13 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,126 $76 Implemented
ST0025 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,196 $216 Implemented
ST0025 # 02 Y:1985 02 1985 USE MINIMUM SAFE OVEN VENTILATION $3,945 $250 Not Implemented
ST0025 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,372 $1,025 Implemented
ST0025 # 04 Y:1985 04 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,350 $537 Implemented
ST0025 # 05 Y:1985 05 1985 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $1,596 $0 Not Implemented
ST0025 # 06 Y:1985 06 1985 RECOVER AND REUSE COOLING WATER $700 $1,000 Implemented
ST0025 # 07 Y:1985 07 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $281 $2,200 Not Implemented
ST0025 # 08 Y:1985 08 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,777 $1,900 Implemented
ST0025 # 09 Y:1985 09 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $25,374 $0 Implemented
ST0025 # 10 Y:1985 10 1985 INSTALL STORM WINDOWS AND DOORS $14,477 $8,500 Not Implemented
ST0025 # 11 Y:1985 11 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $32,119 $10,000 Not Implemented
KU0158 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $14,350 $23,000 Not Implemented
KU0158 # 02 Y:1985 02 1985 INSTALL TIMERS AND/OR THERMOSTATS $12,363 $1,500 Implemented
KU0158 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,601 $5,238 Implemented
KU0158 # 04 Y:1985 04 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,810 $4,900 Implemented
KU0158 # 05 Y:1985 05 1985 IMPROVE LUBRICATION PRACTICES $4,782 $3,000 Not Implemented
KU0158 # 06 Y:1985 06 1985 REDUCE VENTILATION AIR $4,801 $2,500 Implemented
KU0158 # 07 Y:1985 07 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,200 $1,095 Not Implemented