IAC Assessment: ST0025
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ST0025
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Stevens Institute of Technology
Assessment Year 1985
Principal Product BATH ACCESSORIES
NAICS n/a
SIC 2392 - Housefurnishings, Nec
Sales $1,000,000-$5,000,000
# of Employees 220
Plant Area (Sq.Ft.) 0
Annual Production 2,500,000 Pieces
Production Hrs. Annual 2,040
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $176,681 939,625 kWh $0.19
Natural Gas $289 28 MMBtu $10.32
Fuel Oil #2 $28,130 4,410 MMBtu $6.38
TOTAL ENERGY COSTS $205,100
RECOMMENDED SAVINGS* $104,187 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,769
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,196
Cost:
$216
$7,196 38,394 - - - - $7,196
38,394
kWh
-
-
MMBtu
-
-
$
02: 2.2212 USE MINIMUM SAFE OVEN VENTILATION Savings:
$3,945
Cost:
$250
$3,945 21,102 - - - - $3,945
21,102
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,372
Cost:
$1,025
$14,372 76,495 - - - - $14,372
76,495
kWh
-
-
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,350
Cost:
$537
- - $1,350 212 - - -
-
kWh
$1,350
212
MMBtu
-
-
$
05: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$1,596
Cost:
-
$1,716 9,086 - - $(-120) - $1,716
9,086
kWh
-
-
MMBtu
$(-120)
-
$
06: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$700
Cost:
$1,000
$(-71) (-293) - - $771 - $(-71)
(-293)
kWh
-
-
MMBtu
$771
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$281
Cost:
$2,200
- - $281 44 - - -
-
kWh
$281
44
MMBtu
-
-
$
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,777
Cost:
$1,900
$2,777 - - - - - $2,777
-
kWh
-
-
MMBtu
-
-
$
09: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$25,374
Cost:
-
$14,654 77,667 $10,720 1,680 - - $14,654
77,667
kWh
$10,720
1,680
MMBtu
-
-
$
10: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$14,477
Cost:
$8,500
$10,886 58,030 $3,591 563 - - $10,886
58,030
kWh
$3,591
563
MMBtu
-
-
$
11: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$32,119
Cost:
$10,000
$26,234 139,508 $5,885 922 - - $26,234
139,508
kWh
$5,885
922
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$104,187
Cost:
$25,628
$81,709 419,989 $21,827 3,421 $651 - $81,709
419,989
kWh
$21,827
3,421
MMBtu
$651
-
$
TOTAL IMPLEMENTED Savings:
$51,769
Cost:
$4,678
$38,928 192,263 $12,070 1,892 $771 - $38,928
192,263
kWh
$12,070
1,892
MMBtu
$771
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes