IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0445 # 01 Y:1999 01 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $160,542 $811,250 Not Implemented
MA0445 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $3,122 $7,125 Not Implemented
MA0445 # 03 Y:1999 03 1999 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,546 $472 Implemented
MA0445 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $353 $1,090 Implemented
TP0006 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,088 $53,410 Not Implemented
TP0006 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $24 Implemented
TP0006 # 04 Y:1999 04 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,787 $7,300 Implemented
TN0668 # 01 Y:1999 01 1999 REDUCE SCRAP PRODUCTION $674,570 $64,500 Implemented
TN0668 # 02 Y:1999 02 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $238,000 $110,000 Not Implemented
TN0668 # 03 Y:1999 03 1999 OPTIMIZE PLANT POWER FACTOR $9,000 $26,000 Implemented
TN0668 # 04 Y:1999 04 1999 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $7,860 $8,370 Implemented
TN0668 # 05 Y:1999 05 1999 MODIFY CURRENT INCENTIVE PROGRAM $6,300 $1,200 Implemented
TN0668 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,696 $0 Implemented
TN0668 # 07 Y:1999 07 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $2,175 $1,280 Not Implemented
TN0668 # 08 Y:1999 08 1999 METER WASTE WATER $1,120 $3,300 Implemented
TN0668 # 09 Y:1999 09 1999 INSULATE BARE EQUIPMENT $940 $540 Implemented
TN0668 # 10 Y:1999 10 1999 REPAIR AND ELIMINATE STEAM LEAKS $900 $196 Implemented
TN0668 # 11 Y:1999 11 1999 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $690 $0 Implemented
TN0669 # 01 Y:1999 01 1999 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $30,500 $4,500 n/a
TN0669 # 02 Y:1999 02 1999 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $26,935 $1,075 n/a
TN0669 # 03 Y:1999 03 1999 OPTIMIZE PLANT POWER FACTOR $4,942 $9,500 n/a
TN0669 # 04 Y:1999 04 1999 RECOVER AND REUSE WASTE MATERIAL $1,875 $0 n/a
TN0669 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,601 $1,620 n/a
TN0669 # 06 Y:1999 06 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,215 $600 n/a
TP0006 # 01 Y:1999 01 1999 INSTALL OCCUPANCY SENSORS $6,461 $4,589 Implemented