IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0118 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $769 $135 Implemented
LE0118 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $480 $0 Implemented
LE0118 # 05 Y:2001 05 2001 ISOLATE HOT OR COLD EQUIPMENT $339 $1,615 Not Implemented
LE0122 # 01 Y:2001 01 2001 IMPROVE LUBRICATION PRACTICES $2,814 $2,450 Not Implemented
LE0122 # 02 Y:2001 02 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,672 $2,500 Not Implemented
LE0122 # 03 Y:2001 03 2001 BURN A LESS EXPENSIVE GRADE OF FUEL $26,023 $54,800 Not Implemented
LE0122 # 04 Y:2001 04 2001 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $6,091 $0 Not Implemented
LE0122 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,731 $19,320 Not Implemented
LL0117 # 01 Y:2001 01 2001 INSULATE BARE EQUIPMENT $6,884 $1,584 Implemented
LL0117 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $6,884 $10,424 Not Implemented
LL0117 # 03 Y:2001 03 2001 USE PHOTOCELL CONTROLS $3,669 $325 Not Implemented
LL0117 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,075 $1,140 Implemented
LL0117 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,388 $1,830 Implemented
LL0117 # 06 Y:2001 06 2001 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $6,174 $0 Implemented
SU0125 # 01 Y:2001 01 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,561 $0 Implemented
SU0125 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,467 $0 Implemented
SU0125 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,122 $20,070 Implemented
SU0125 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $2,096 $665 Not Implemented
SU0125 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,687 $342 Not Implemented
SU0125 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,313 $840 Not Implemented
SU0125 # 07 Y:2001 07 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $920 $3,275 Not Implemented
SU0125 # 08 Y:2001 08 2001 OPTIMIZE PLANT POWER FACTOR $4,470 $6,200 Implemented
SU0125 # 09 Y:2001 09 2001 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $34,312 $0 Implemented
SU0125 # 10 Y:2001 10 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,216 $9,990 Not Implemented
SU0125 # 11 Y:2001 11 2001 RECOVER WASTE HEAT FROM EQUIPMENT $10,719 $760 Implemented