Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
162,371
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0217 # 04 Y:1984 | 04 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,424 | $1,200 | Implemented |
TN0217 # 05 Y:1984 | 05 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,488 | $0 | Not Implemented |
TN0217 # 06 Y:1984 | 06 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,447 | $0 | Implemented |
TN0217 # 07 Y:1984 | 07 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,610 | $50 | Implemented |
TN0218 # 01 Y:1984 | 01 | 1984 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $8,908 | $15,000 | Not Implemented |
TN0218 # 02 Y:1984 | 02 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,382 | $0 | Not Implemented |
TN0218 # 03 Y:1984 | 03 | 1984 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,352 | $3,700 | Implemented |
TN0218 # 04 Y:1984 | 04 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,746 | $180 | Not Implemented |
TN0218 # 05 Y:1984 | 05 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,078 | $4,350 | Not Implemented |
TN0218 # 06 Y:1984 | 06 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $758 | $0 | Not Implemented |
TN0218 # 07 Y:1984 | 07 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $677 | $90 | Implemented |
CO0002 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,148 | $10,260 | Implemented |
CO0002 # 02 Y:1984 | 02 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,158 | $300 | Not Implemented |
CO0002 # 03 Y:1984 | 03 | 1984 | INSTALL STEAM TRAP | $1,507 | $254 | Implemented |
CO0002 # 04 Y:1984 | 04 | 1984 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $814 | $250 | Not Implemented |
CO0002 # 05 Y:1984 | 05 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,061 | $0 | Implemented |
CO0002 # 06 Y:1984 | 06 | 1984 | OPTIMIZE PLANT POWER FACTOR | $9,850 | $10,000 | Not Implemented |
CO0002 # 07 Y:1984 | 07 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $10,932 | $1,557 | Implemented |
CO0003 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,060 | $300 | Implemented |
CO0003 # 02 Y:1984 | 02 | 1984 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,272 | $2,500 | Implemented |
CO0003 # 03 Y:1984 | 03 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $594 | $118 | Implemented |
CO0003 # 04 Y:1984 | 04 | 1984 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,430 | $500 | Implemented |
CO0003 # 05 Y:1984 | 05 | 1984 | INSTALL TURBULATORS | $1,594 | $1,100 | Implemented |
CO0003 # 06 Y:1984 | 06 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $435 | $800 | Implemented |
CO0003 # 07 Y:1984 | 07 | 1984 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $410 | $300 | Implemented |