IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161,963

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0187 # 03 Y:1983 03 1983 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $265 $0 Not Implemented
TN0189 # 01 Y:1983 01 1983 OPTIMIZE PLANT POWER FACTOR $530 $4,000 Not Implemented
TN0189 # 02 Y:1983 02 1983 UPGRADE OBSOLETE EQUIPMENT $540 $60 Not Implemented
UD0100 # 01 Y:1983 01 1983 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,030 $1,000 Implemented
UD0100 # 02 Y:1983 02 1983 INSTALL STORM WINDOWS AND DOORS $5,208 $2,000 Implemented
UD0100 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,279 $4,668 Implemented
UD0100 # 04 Y:1983 04 1983 INSTALL TIMERS AND/OR THERMOSTATS $7,768 $2,000 Implemented
UD0100 # 05 Y:1983 05 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $263 $1,590 Not Implemented
UD0101 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,400 $28,821 Not Implemented
UD0101 # 02 Y:1983 02 1983 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,217 $0 Implemented
UD0101 # 03 Y:1983 03 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $548 $0 Not Implemented
UD0101 # 04 Y:1983 04 1983 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $8,185 $60,000 Not Implemented
UD0102 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,360 $20,448 Not Implemented
UD0103 # 01 Y:1983 01 1983 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $7,752 $10,000 Not Implemented
UD0103 # 02 Y:1983 02 1983 RECOVER WASTE HEAT FROM EQUIPMENT $7,536 $20,000 Not Implemented
UD0104 # 01 Y:1983 01 1983 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $39,300 $0 Implemented
UD0104 # 02 Y:1983 02 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,527 $0 Implemented
UD0104 # 03 Y:1983 03 1983 INSTALL TIMERS AND/OR THERMOSTATS $10,180 $4,000 Implemented
UD0104 # 04 Y:1983 04 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,605 $1,592 Implemented
UD0104 # 05 Y:1983 05 1983 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,680 $3,100 Implemented
UD0104 # 06 Y:1983 06 1983 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $2,683 $8,480 Implemented
UD0105 # 01 Y:1983 01 1983 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $18,641 $60,000 Not Implemented
UD0105 # 02 Y:1983 02 1983 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $1,481 $1,800 Not Implemented
UD0105 # 03 Y:1983 03 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,286 $3,840 Implemented
UD0105 # 04 Y:1983 04 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,661 $167 Implemented