IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,746

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0114 # 09 Y:1984 09 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,002 $1,050 Not Implemented
KU0115 # 01 Y:1984 01 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,417 $100 Implemented
KU0115 # 02 Y:1984 02 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,391 $965 Not Implemented
KU0115 # 03 Y:1984 03 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,447 $1,181 Implemented
KU0115 # 04 Y:1984 04 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $398 $100 Implemented
KU0115 # 05 Y:1984 05 1984 INSTALL AUTOMATIC STACK DAMPER $175 $2,500 Implemented
UD0114 # 01 Y:1984 01 1984 UPGRADE OBSOLETE EQUIPMENT $20,480 $5,070 Implemented
UD0114 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,818 $900 Implemented
UD0114 # 03 Y:1984 03 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $852 $0 Not Implemented
UD0114 # 04 Y:1984 04 1984 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,038 $4,000 Implemented
UD0114 # 05 Y:1984 05 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,377 $33,750 Implemented
UD0114 # 06 Y:1984 06 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,899 $0 Implemented
UD0116 # 01 Y:1984 01 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $22,546 $27,000 Not Implemented
UD0116 # 02 Y:1984 02 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,320 $3,000 Implemented
UD0116 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,013 $670 Implemented
UD0116 # 04 Y:1984 04 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $18,628 $99,000 Implemented
UD0116 # 05 Y:1984 05 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $28,956 $69,700 Not Implemented
UD0116 # 06 Y:1984 06 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,705 $3,000 Not Implemented
OK0134 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $236 $0 Implemented
OK0134 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68 $118 Implemented
OK0134 # 03 Y:1984 03 1984 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $84 $240 Implemented
OK0134 # 04 Y:1984 04 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42 $35 Implemented
OK0134 # 05 Y:1984 05 1984 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $21 $60 Implemented
OK0134 # 06 Y:1984 06 1984 INSTALL TIMERS AND/OR THERMOSTATS $497 $550 Implemented
OK0116 # 01 Y:1984 01 1984 HEAT WATER WITH EXHAUST HEAT $27,640 $36,000 Not Implemented