IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,417

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0001 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,168 $500 Implemented
AS0001 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,710 $0 Implemented
AS0001 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,289 $656 Not Implemented
AS0001 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,764 $1,440 Implemented
AS0001 # 06 Y:1990 06 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $882 $1,800 Implemented
AS0001 # 07 Y:1990 07 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $717 $250 Implemented
AS0002 # 01 Y:1990 01 1990 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $281,965 $1,050,000 Not Implemented
AS0002 # 02 Y:1990 02 1990 OPERATE BOILERS ON HIGH FIRE SETTING $18,029 $100,000 Implemented
AS0002 # 03 Y:1990 03 1990 INSTALL SET-BACK TIMERS $7,055 $3,521 Implemented
AS0002 # 04 Y:1990 04 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,653 $1,000 Implemented
AS0002 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,704 $2,813 Implemented
AS0002 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $262 $335 Not Implemented
AS0002 # 07 Y:1990 07 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $343 $427 Implemented
AS0002 # 08 Y:1990 08 1990 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,815 $1,530 Not Implemented
AS0002 # 09 Y:1990 09 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $390 $1,300 Implemented
TN0403 # 01 Y:1990 01 1990 REDUCE EXCESS STEAM BLEEDING $5,335 $1,280 Implemented
TN0403 # 02 Y:1990 02 1990 INSULATE BARE EQUIPMENT $4,167 $2,442 Not Implemented
TN0403 # 03 Y:1990 03 1990 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $1,886 $4,964 Not Implemented
TN0403 # 04 Y:1990 04 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $501 $356 Implemented
TN0403 # 05 Y:1990 05 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $213 $300 Implemented
TN0403 # 06 Y:1990 06 1990 INSTALL SET-BACK TIMERS $532 $0 Implemented
TN0403 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $742 $236 Implemented
TN0403 # 08 Y:1990 08 1990 IMPROVE LUBRICATION PRACTICES $322 $180 Not Implemented
TN0403 # 09 Y:1990 09 1990 KEEP LAMPS AND REFLECTORS CLEAN $303 $963 Not Implemented
TN0403 # 10 Y:1990 10 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $161 $90 Implemented