IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0062 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,893 $4,042 Implemented
UM0062 # 03 Y:1996 03 1996 OPTIMIZE PLANT POWER FACTOR $10,881 $250 Implemented
UM0062 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,611 $3,000 Not Implemented
UM0062 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $701 $100 Implemented
UM0062 # 06 Y:1996 06 1996 USE SYNTHETIC LUBRICANT $1,533 $658 Implemented
UM0062 # 07 Y:1996 07 1996 TREAT AND REUSE RINSE WATERS $3,084 $0 Not Implemented
WV0101 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $682 $347 Implemented
WV0101 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $156 $450 Implemented
WV0101 # 03 Y:1996 03 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $164 $121 Implemented
WV0101 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $448 $240 Not Implemented
WV0101 # 05 Y:1996 05 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,091 $1,467 Not Implemented
WV0101 # 06 Y:1996 06 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,690 $5,000 Not Implemented
WV0101 # 07 Y:1996 07 1996 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,839 $0 Implemented
WV0101 # 08 Y:1996 08 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,163 $10,000 Not Implemented
DS0067 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $444 $4,230 Implemented
DS0067 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,024 $14,718 Not Implemented
DS0067 # 03 Y:1996 03 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $5,310 $8,238 Not Implemented
DS0067 # 04 Y:1996 04 1996 OPTIMIZE PLANT POWER FACTOR $9,685 $6,735 Implemented
DS0067 # 05 Y:1996 05 1996 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $7,027 $2,390 Implemented
DS0067 # 06 Y:1996 06 1996 RECOVER AND REUSE WASTE MATERIAL $773 $900 Not Implemented
AS0190 # 01 Y:1996 01 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,769 $100 Implemented
AS0190 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,298 $440 Implemented
AS0190 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $2,310 $2,025 Implemented
AS0190 # 04 Y:1996 04 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,913 $5,700 Implemented
AS0190 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,052 $2,348 Not Implemented