IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0471 # 04 Y:2000 04 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,810 $0 Implemented
CO0471 # 05 Y:2000 05 2000 CONVERT TO ELECTROSTATIC POWDER COATING $73,840 $690,300 Not Implemented
ND0358 # 01 Y:2000 01 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,922 $8,000 Not Implemented
ND0358 # 02 Y:2000 02 2000 BURN A LESS EXPENSIVE GRADE OF FUEL $11,307 $39,100 Not Implemented
ND0358 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $164 $400 Not Implemented
ND0358 # 04 Y:2000 04 2000 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $67 $30 Not Implemented
ND0358 # 05 Y:2000 05 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,996 $300 Not Implemented
ND0358 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,588 $555 Not Implemented
ND0358 # 07 Y:2000 07 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,479 $280 Not Implemented
ND0358 # 08 Y:2000 08 2000 INSTALL OCCUPANCY SENSORS $78 $200 Not Implemented
OD0169 # 01 Y:2000 01 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $431 $258 Not Implemented
OD0169 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $972 $1,400 Implemented
OD0169 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $990 $1,800 Implemented
OD0169 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,833 $10,623 Not Implemented
OD0169 # 05 Y:2000 05 2000 METER WASTE WATER $4,712 $1,000 Not Implemented
OD0169 # 06 Y:2000 06 2000 PAY UTILITY BILLS ON TIME $1,500 $0 Implemented
OD0169 # 07 Y:2000 07 2000 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $8,415 $0 Not Implemented
MO0289 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,781 $5,125 Not Implemented
MO0289 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $600 $40 Not Implemented
MO0289 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,341 $105 Not Implemented
MO0289 # 04 Y:2000 04 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $804 $885 Not Implemented
MO0289 # 05 Y:2000 05 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,800 $0 Not Implemented
MO0289 # 06 Y:2000 06 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $13,480 $3,700 Not Implemented
MO0289 # 07 Y:2000 07 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $33,048 $2,000 Not Implemented
MO0288 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $952 $2,528 Not Implemented