Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0615 # 10 Y:2012 | 10 | 2012 | USE SYNTHETIC LUBRICANT | $760 | $0 | Implemented |
CO0660 # 01 Y:2012 | 01 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $510 | $3,090 | Implemented |
CO0660 # 02 Y:2012 | 02 | 2012 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,610 | $500 | Implemented |
CO0660 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,410 | $3,310 | Not Implemented |
SF0419 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $637 | $80 | Implemented |
SF0419 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,754 | $2,287 | Not Implemented |
SF0419 # 03 Y:2012 | 03 | 2012 | USE COLD WASTE WATER TO COOL CHILLER FEED WATER | $1,176 | $963 | Not Implemented |
SF0419 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,431 | $16,162 | Implemented |
SF0419 # 05 Y:2012 | 05 | 2012 | INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM | $8,615 | $42,287 | Not Implemented |
SF0419 # 06 Y:2012 | 06 | 2012 | HEAT WATER WITH EXHAUST HEAT | $5,628 | $35,328 | Not Implemented |
UMS011 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,224,000 | $1,300,000 | Not Implemented |
UMS011 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $275,000 | $500,000 | Not Implemented |
UMS011 # 03 Y:2012 | 03 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $196,000 | $300,000 | Not Implemented |
UMS011 # 04 Y:2012 | 04 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $113,000 | $70,000 | Not Implemented |
UMS011 # 05 Y:2012 | 05 | 2012 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $100,000 | $200,000 | Not Implemented |
UMS011 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $40,000 | $40,000 | Not Implemented |
IA0485 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,660 | $273 | Implemented |
IA0485 # 02 Y:2012 | 02 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $688 | $525 | Implemented |
IA0485 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,133 | $1,343 | Implemented |
IA0485 # 04 Y:2012 | 04 | 2012 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,683 | $1,560 | Not Implemented |
IA0485 # 05 Y:2012 | 05 | 2012 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $774 | $989 | Implemented |
IA0485 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $910 | $3,310 | Not Implemented |
IA0485 # 07 Y:2012 | 07 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,493 | $2,044 | Implemented |
IA0485 # 08 Y:2012 | 08 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,511 | $2,009 | Implemented |
IA0485 # 09 Y:2012 | 09 | 2012 | INSTALL OCCUPANCY SENSORS | $893 | $882 | Implemented |