Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
161,963
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0030 # 06 Y:1982 | 06 | 1982 | REDESIGN PROCESS | $11,311 | $80,000 | Not Implemented |
KU0031 # 01 Y:1982 | 01 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $368 | $450 | Not Implemented |
KU0031 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,393 | $725 | Not Implemented |
KU0031 # 03 Y:1982 | 03 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,083 | $3,000 | Not Implemented |
KU0031 # 04 Y:1982 | 04 | 1982 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,474 | $1,010 | Not Implemented |
KU0031 # 05 Y:1982 | 05 | 1982 | REPAIR AND ELIMINATE STEAM LEAKS | $10,740 | $750 | Not Implemented |
KU0032 # 01 Y:1982 | 01 | 1982 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $14,570 | $0 | Not Implemented |
KU0032 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,434 | $0 | Not Implemented |
KU0032 # 03 Y:1982 | 03 | 1982 | INSULATE BARE EQUIPMENT | $3,756 | $475 | Not Implemented |
KU0032 # 04 Y:1982 | 04 | 1982 | INSTALL STORM WINDOWS AND DOORS | $1,984 | $568 | Not Implemented |
KU0032 # 05 Y:1982 | 05 | 1982 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $28,113 | $40,000 | Not Implemented |
KU0033 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,443 | $3,935 | Implemented |
KU0033 # 02 Y:1982 | 02 | 1982 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,573 | $0 | Implemented |
KU0033 # 03 Y:1982 | 03 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $509 | $700 | Implemented |
KU0033 # 04 Y:1982 | 04 | 1982 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $69 | $0 | Implemented |
UD0017 # 01 Y:1982 | 01 | 1982 | USE OPTIMUM THICKNESS INSULATION | $1,212 | $0 | Implemented |
UD0017 # 02 Y:1982 | 02 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,596 | $25,000 | Implemented |
UD0017 # 03 Y:1982 | 03 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,526 | $776 | Implemented |
UD0019 # 01 Y:1982 | 01 | 1982 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $550 | $150 | Implemented |
UD0019 # 02 Y:1982 | 02 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,596 | $5,400 | Implemented |
UD0020 # 01 Y:1982 | 01 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $20,824 | $30,000 | Implemented |
UD0020 # 02 Y:1982 | 02 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $430 | $300 | Implemented |
UD0020 # 03 Y:1982 | 03 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $138 | $350 | Not Implemented |
UD0021 # 01 Y:1982 | 01 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,609 | $576 | Implemented |
UD0021 # 02 Y:1982 | 02 | 1982 | INSTALL STORM WINDOWS AND DOORS | $330 | $314 | Implemented |