IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0050 # 04 Y:2010 04 2010 INCREASE AMOUNT OF CONDENSATE RETURNED $103,313 $74,525 Not Implemented
UA0050 # 05 Y:2010 05 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $4,904 $2,890 Implemented
UA0050 # 06 Y:2010 06 2010 REPAIR AND ELIMINATE STEAM LEAKS $70,430 $4,075 Not Implemented
UA0050 # 07 Y:2010 07 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,300 $160 Implemented
UA0049 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,990 $39,640 Implemented
UA0049 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $10,150 $384 Implemented
UA0049 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,870 $0 Not Implemented
UA0049 # 04 Y:2010 04 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,275 $2,520 Not Implemented
UA0049 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,170 $22,560 Implemented
UA0049 # 06 Y:2010 06 2010 USE PHOTOCELL CONTROLS $1,280 $670 Not Implemented
UA0049 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $1,060 $935 Implemented
UA0049 # 08 Y:2010 08 2010 USE OPTIMUM THICKNESS INSULATION $13,000 $13,430 Not Implemented
UA0049 # 09 Y:2010 09 2010 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $2,800 $2,000 Implemented
UA0049 # 10 Y:2010 10 2010 COMBINE UTILITY METERS $25,470 $17,700 Implemented
UA0047 # 01 Y:2010 01 2010 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $427,575 $685,000 Not Implemented
UA0047 # 02 Y:2010 02 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,473 $0 Not Implemented
UA0047 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,635 $740 Not Implemented
UA0047 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,938 $75,000 Not Implemented
UA0047 # 05 Y:2010 05 2010 MINIMIZE WATER USAGE $12,306 $8,325 Implemented
UA0047 # 06 Y:2010 06 2010 OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS $155,078 $222,874 Not Implemented
UA0047 # 07 Y:2010 07 2010 INSULATE BARE EQUIPMENT $1,140 $713 Not Implemented
UA0048 # 01 Y:2010 01 2010 USE RADIANT HEATER FOR SPOT HEATING $8,059 $4,878 Not Implemented
UA0048 # 02 Y:2010 02 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $486 $0 Implemented
UA0048 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $6,421 $0 Implemented
UA0048 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $3,976 $728 Implemented