Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,193
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0339 # 06 Y:2008 | 06 | 2008 | INSULATE BARE EQUIPMENT | $3,808 | $682 | Not Implemented |
UM0339 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,808 | $4,620 | Not Implemented |
UM0338 # 01 Y:2008 | 01 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $30,146 | $38,350 | Not Implemented |
UM0338 # 02 Y:2008 | 02 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,908 | $4,000 | Not Implemented |
UM0338 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,301 | $19,680 | Not Implemented |
UM0338 # 04 Y:2008 | 04 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,640 | $1,400 | Not Implemented |
UM0338 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,107 | $900 | Not Implemented |
UM0338 # 06 Y:2008 | 06 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,305 | $4,480 | Not Implemented |
UM0338 # 07 Y:2008 | 07 | 2008 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $257 | $1,095 | Not Implemented |
UM0338 # 08 Y:2008 | 08 | 2008 | INSTALL OCCUPANCY SENSORS | $103 | $270 | Not Implemented |
UM0337 # 01 Y:2008 | 01 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $16,708 | $8,050 | Not Implemented |
UM0337 # 02 Y:2008 | 02 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,515 | $240 | Implemented |
UM0337 # 03 Y:2008 | 03 | 2008 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,264 | $990 | Not Implemented |
UM0337 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,938 | $8,520 | Not Implemented |
UM0337 # 05 Y:2008 | 05 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,090 | $942 | Not Implemented |
UM0337 # 06 Y:2008 | 06 | 2008 | INSULATE BARE EQUIPMENT | $791 | $478 | Implemented |
UM0337 # 07 Y:2008 | 07 | 2008 | INSTALL OCCUPANCY SENSORS | $666 | $510 | Not Implemented |
UM0336 # 01 Y:2008 | 01 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,330 | $1,650 | Implemented |
UM0336 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,116 | $200 | Implemented |
UM0336 # 03 Y:2008 | 03 | 2008 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $13,866 | $29,119 | Not Implemented |
UM0336 # 04 Y:2008 | 04 | 2008 | REDUCE VENTILATION AIR | $8,256 | $2,001 | Not Implemented |
UM0336 # 05 Y:2008 | 05 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,239 | $10,900 | Not Implemented |
UM0336 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $6,297 | $1,600 | Implemented |
UM0336 # 07 Y:2008 | 07 | 2008 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,932 | $1,000 | Implemented |
UM0336 # 08 Y:2008 | 08 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,766 | $260 | Not Implemented |