IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0141 # 04 Y:2008 04 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,400 $0 Not Implemented
IC0141 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,800 $49,250 Implemented
IC0141 # 06 Y:2008 06 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,794 $14,000 Implemented
IC0141 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,000 $11,500 Implemented
IC0141 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,750 $1,400 Implemented
IC0141 # 09 Y:2008 09 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $59,840 $25,152 Not Implemented
IC0141 # 10 Y:2008 10 2008 REPAIR OR REPLACE STEAM TRAPS $19,800 $17,250 Not Implemented
IC0141 # 11 Y:2008 11 2008 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $113,748 $180,000 Not Implemented
UA0024 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,342 $0 Implemented
UA0024 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,878 $1,500 Implemented
UA0024 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,199 $14,155 Not Implemented
UA0024 # 04 Y:2008 04 2008 DISCONNECT BALLASTS $1,392 $243 Implemented
UA0024 # 05 Y:2008 05 2008 REPAIR AND ELIMINATE STEAM LEAKS $6,203 $300 Implemented
UA0024 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $4,555 $2,415 Implemented
UA0024 # 07 Y:2008 07 2008 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $98,000 $126,000 Not Implemented
UA0024 # 08 Y:2008 08 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $24,566 $23,000 Not Implemented
UA0024 # 09 Y:2008 09 2008 RECOVER WASTE HEAT FROM EQUIPMENT $42,744 $45,700 Not Implemented
SU0271 # 01 Y:2008 01 2008 PAY BILLS ON TIME TO AVOID LATE FEES $2,751 $0 Not Implemented
SU0271 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $36,827 $3,125 Not Implemented
SU0271 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,435 $2,841 Not Implemented
SU0271 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,111 $1,559 Not Implemented
SU0271 # 05 Y:2008 05 2008 INSULATE FEEDWATER TANK $3,428 $746 Not Implemented
SU0271 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $773 $249 Not Implemented
SU0271 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $31,841 $16,299 Not Implemented
SU0271 # 08 Y:2008 08 2008 REPLACE BOILER $199,772 $200,000 Not Implemented