IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0195 # 04 Y:2017 04 2017 USE MINIMUM STEAM OPERATING PRESSURE $457 $0 Not Implemented
IC0195 # 05 Y:2017 05 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $49 $6 Not Implemented
IC0195 # 06 Y:2017 06 2017 REPLACE BOILER $183,000 $30,000 Implemented
IC0195 # 07 Y:2017 07 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $32,126 $16,175 Not Implemented
IC0195 # 08 Y:2017 08 2017 UPGRADE CONTROLS ON COMPRESSORS $3,210 $2,555 Not Implemented
IC0195 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,417 $5,650 Implemented
IC0195 # 10 Y:2017 10 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,782 $11,163 Implemented
IC0195 # 11 Y:2017 11 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $697,569 $2,619,820 Not Implemented
SU0446 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,759 $0 Implemented
SU0446 # 02 Y:2017 02 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,711 $7,161 Not Implemented
SU0446 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $304 $234 Not Implemented
SU0446 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170 $165 Implemented
SU0446 # 05 Y:2017 05 2017 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $6,295 $18,204 Not Implemented
SU0446 # 06 Y:2017 06 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $290 $854 Not Implemented
LE0440 # 01 Y:2017 01 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,163 $17 Implemented
LE0440 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $97,167 $5,000 Implemented
LE0440 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $21,749 $3,000 Implemented
LE0440 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $41,418 $13,000 Implemented
LE0440 # 05 Y:2017 05 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $55,847 $28,000 Not Implemented
LE0440 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $128,735 $65,000 Not Implemented
LE0440 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,410 $26,250 Not Implemented
LE0440 # 08 Y:2017 08 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $86,307 $68,000 Implemented
LE0440 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,392 $38,954 Implemented
LE0440 # 10 Y:2017 10 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,063 $56,424 Implemented
LE0440 # 11 Y:2017 11 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,060 $20,000 Implemented