Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,485
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0355 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,941 | $59,135 | Implemented |
MI0355 # 06 Y:2019 | 06 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $20,441 | $72,870 | Implemented |
MI0355 # 07 Y:2019 | 07 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $13,642 | $960 | Not Implemented |
MI0355 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,503 | $2,020 | Not Implemented |
MI0355 # 09 Y:2019 | 09 | 2019 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,604 | $2,070 | Implemented |
UD0999 # 01 Y:2019 | 01 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,762 | $0 | Not Implemented |
UD0999 # 02 Y:2019 | 02 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,453 | $0 | Implemented |
UD0999 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $6,465 | $596 | Not Implemented |
UD0999 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $4,677 | $353 | Not Implemented |
UD0999 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $19,669 | $11,170 | Not Implemented |
SF0542 # 01 Y:2019 | 01 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,762 | $0 | Implemented |
SF0542 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,796 | $1,080 | Implemented |
SF0542 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,079 | $180 | Not Implemented |
SF0542 # 04 Y:2019 | 04 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,409 | $1,384 | Implemented |
SF0542 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $143 | $111 | Not Implemented |
SF0542 # 06 Y:2019 | 06 | 2019 | USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING | $3,054 | $9,087 | Implemented |
SF0542 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,214 | $49,905 | Implemented |
GT0928 # 01 Y:2019 | 01 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $17,607 | $950 | Implemented |
GT0928 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,605 | $1,741 | Implemented |
GT0928 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,360 | $33,097 | Implemented |
GT0928 # 04 Y:2019 | 04 | 2019 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $3,786 | $9,100 | Not Implemented |
GT0928 # 05 Y:2019 | 05 | 2019 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $2,682 | $7,500 | Not Implemented |
UA0212 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,249 | $36,249 | Not Implemented |
UA0212 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $92 | $129 | Not Implemented |
UA0212 # 03 Y:2019 | 03 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $18,989 | $30,818 | Not Implemented |