Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,314
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0310 # 04 Y:2001 | 04 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $533 | $1,400 | Not Implemented |
AS0310 # 05 Y:2001 | 05 | 2001 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $12,000 | $3,100 | Implemented |
AS0310 # 06 Y:2001 | 06 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $54,594 | $2,880 | Not Implemented |
AS0310 # 07 Y:2001 | 07 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $36,400 | $10,400 | Not Implemented |
AS0309 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,341 | $3,800 | Implemented |
AS0309 # 02 Y:2001 | 02 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $426 | $480 | Implemented |
AS0309 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $305 | $60 | Implemented |
AS0309 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $962 | $4,006 | Implemented |
AS0309 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $22 | $75 | Not Implemented |
AS0309 # 06 Y:2001 | 06 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $585 | $1,400 | Implemented |
AS0309 # 07 Y:2001 | 07 | 2001 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,413 | $60 | Implemented |
AS0309 # 08 Y:2001 | 08 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,773 | $685 | Implemented |
AS0308 # 01 Y:2001 | 01 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $339 | $548 | n/a |
AS0308 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,345 | $120 | n/a |
AS0308 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,163 | $4,543 | n/a |
AS0308 # 04 Y:2001 | 04 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $961 | $30 | n/a |
AS0308 # 05 Y:2001 | 05 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $23,040 | $60 | n/a |
AS0308 # 06 Y:2001 | 06 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $660 | $106 | n/a |
AS0308 # 07 Y:2001 | 07 | 2001 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $107,375 | $3,303 | n/a |
AS0308 # 08 Y:2001 | 08 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $41,767 | $9,675 | n/a |
AS0307 # 01 Y:2001 | 01 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $328 | $530 | Not Implemented |
AS0307 # 02 Y:2001 | 02 | 2001 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $4,902 | $30,252 | Not Implemented |
AS0307 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $88 | $225 | Not Implemented |
AS0307 # 04 Y:2001 | 04 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $713 | $735 | Not Implemented |
AS0307 # 05 Y:2001 | 05 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,586 | $60 | Not Implemented |