IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,317

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0203 # 05 Y:2000 05 2000 COVER OPEN TANKS $3,228 $1,336 Implemented
WV0203 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $233 $129 Not Implemented
WV0203 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $223 $45 Implemented
WV0203 # 08 Y:2000 08 2000 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $337 $222 Implemented
WV0203 # 09 Y:2000 09 2000 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $18,899 $3,577 Not Implemented
WV0203 # 10 Y:2000 10 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $123,125 $120,000 Not Implemented
WV0203 # 11 Y:2000 11 2000 IMPROVE SPACE COMFORT CONDITIONING $6,500 $8,000 Not Implemented
WV0203 # 12 Y:2000 12 2000 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $22,000 $4,000 Not Implemented
WV0195 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $6,939 $3,252 Implemented
WV0195 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $808 $275 Not Implemented
WV0195 # 03 Y:2000 03 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $937 $500 Not Implemented
WV0195 # 04 Y:2000 04 2000 REPAIR OR REPLACE STEAM TRAPS $2,348 $1,368 Implemented
WV0195 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,494 $664 Implemented
WV0195 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $531 $154 Not Implemented
WV0195 # 07 Y:2000 07 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $908 $912 Implemented
WV0195 # 08 Y:2000 08 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $4,000 $863 Implemented
WV0195 # 09 Y:2000 09 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,880 $100 Implemented
WV0195 # 10 Y:2000 10 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $2,000 $400 Implemented
WV0195 # 11 Y:2000 11 2000 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $11,700 $500 Implemented
WV0194 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,827 $1,400 Not Implemented
WV0194 # 02 Y:2000 02 2000 USE RADIANT HEATER FOR SPOT HEATING $25,513 $23,400 Not Implemented
WV0194 # 03 Y:2000 03 2000 USE OPTIMUM TEMPERATURE $60,864 $75,000 Not Implemented
WV0194 # 04 Y:2000 04 2000 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,330 $210 Implemented
WV0194 # 05 Y:2000 05 2000 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,224 $460 Implemented
WV0194 # 06 Y:2000 06 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $318 $500 Not Implemented