IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,777

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0022 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $774 $134 Implemented
IA0022 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,737 $1,196 Implemented
IA0022 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $538 $229 Implemented
IA0022 # 07 Y:1992 07 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,988 $100 Not Implemented
IA0023 # 01 Y:1992 01 1992 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $136,664 $13,000 n/a
IA0023 # 02 Y:1992 02 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,994 $16 n/a
IA0023 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,957 $1,480 n/a
IA0023 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,986 $8,825 n/a
IA0023 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $1,114 $1,188 n/a
IA0023 # 06 Y:1992 06 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,709 $8,000 n/a
IA0023 # 07 Y:1992 07 1992 OPTIMIZE PLANT POWER FACTOR $94,150 $84,875 n/a
IA0023 # 08 Y:1992 08 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $211,326 $1 n/a
IA0024 # 01 Y:1992 01 1992 RECOVER WASTE HEAT FROM EQUIPMENT $12,552 $51,000 Implemented
IA0024 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $8,634 $3,600 Not Implemented
IA0024 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,997 $467 Not Implemented
IA0024 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $857 $1,660 Not Implemented
IA0024 # 05 Y:1992 05 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $422 $450 Not Implemented
IA0024 # 06 Y:1992 06 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,454 $50 Implemented
IA0024 # 07 Y:1992 07 1992 RECOVER WASTE HEAT FROM EQUIPMENT $2,218 $1,218 Implemented
IA0024 # 08 Y:1992 08 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,688 $426 Implemented
IA0024 # 09 Y:1992 09 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,941 $100 Not Implemented
IA0025 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,172 $50 Not Implemented
IA0025 # 02 Y:1992 02 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,350 $30 Implemented
IA0025 # 03 Y:1992 03 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,129 $200 Not Implemented
IA0025 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,132 $126 Not Implemented