IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0254 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $19,091 $3,880 Implemented
LL0254 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $18,943 $4,090 Implemented
LL0254 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $5,345 $2,565 Not Implemented
LL0254 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $5,323 $1,185 Not Implemented
LL0254 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,656 $1,920 Not Implemented
LL0254 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $867 $555 Not Implemented
LL0254 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $94 $102 Not Implemented
MI0133 # 01 Y:2006 01 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $86,700 $3,400 Not Implemented
MI0133 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $34,704 $0 Implemented
MI0133 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,100 $10,050 Not Implemented
MI0133 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,584 $964 Implemented
MI0133 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,755 $30 Implemented
MI0133 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,350 $3,400 Not Implemented
SF0332 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $10,511 $0 Implemented
SF0332 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $66,216 $5,557 Implemented
SF0332 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,653 $238 Not Implemented
SF0332 # 04 Y:2006 04 2006 REPLACE BOILER $683,163 $1,003,522 Not Implemented
SU0238 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $98,366 $0 Implemented
SU0238 # 02 Y:2006 02 2006 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $55,282 $0 Implemented
SU0238 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,431 $0 Not Implemented
SU0238 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $1,534 $0 Not Implemented
SU0238 # 05 Y:2006 05 2006 DISCONNECT BALLASTS $788 $0 Implemented
SU0238 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,073 $578 Implemented
SU0238 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,210 $264 Implemented
SU0238 # 08 Y:2006 08 2006 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,018 $1,094 Not Implemented