IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0150 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $10,741 $5,000 Not Implemented
MI0150 # 07 Y:2007 07 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,315 $2,627 Not Implemented
MI0150 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,220 $30 Implemented
MI0150 # 09 Y:2007 09 2007 PAY BILLS ON TIME TO AVOID LATE FEES $1,658 $300 Implemented
MI0150 # 10 Y:2007 10 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $1,203 $240 Not Implemented
MI0150 # 11 Y:2007 11 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $651 $3,010 Not Implemented
MI0149 # 01 Y:2007 01 2007 USE PHOTOCELL CONTROLS $13,292 $3,157 Not Implemented
MI0149 # 02 Y:2007 02 2007 INSTALL SKYLIGHTS $6,818 $21,792 Not Implemented
MI0149 # 03 Y:2007 03 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,814 $120 Implemented
MI0149 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,030 $1,074 Implemented
MI0149 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,014 $30 Not Implemented
TT0004 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $20,486 $2,500 Implemented
TT0004 # 02 Y:2007 02 2007 INSULATE FEEDWATER TANK $654 $500 Implemented
TT0004 # 03 Y:2007 03 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,491 $0 Implemented
TT0004 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $402 $0 Implemented
TT0004 # 05 Y:2007 05 2007 REPAIR OR REPLACE STEAM TRAPS $557 $0 Not Implemented
UD0764 # 01 Y:2007 01 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $101,033 $243,645 Not Implemented
UD0764 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $35,952 $98,336 Implemented
UD0764 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,818 $49,600 Implemented
UD0764 # 04 Y:2007 04 2007 OPTIMIZE PLANT POWER FACTOR $24,334 $6,000 Not Implemented
UD0764 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,675 $1,275 Implemented
UD0764 # 06 Y:2007 06 2007 INSTALL REPLACEMENT DOORS $6,223 $13,000 Not Implemented
UD0764 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $3,230 $760 Implemented
UD0764 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,437 $0 Implemented
TT0005 # 01 Y:2007 01 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,913 $7,515 Not Implemented