IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0839 # 08 Y:2011 08 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $80,401 $90,000 Not Implemented
UD0839 # 09 Y:2011 09 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,418 $3,000 Implemented
UD0839 # 10 Y:2011 10 2011 OPERATE BOILERS ON HIGH FIRE SETTING $11,810 $23,620 Implemented
UD0839 # 11 Y:2011 11 2011 REPAIR AND ELIMINATE STEAM LEAKS $5,425 $2,100 Implemented
UD0839 # 12 Y:2011 12 2011 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,987 $993 Implemented
UD0839 # 13 Y:2011 13 2011 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $48,911 $75,000 Implemented
UD0839 # 14 Y:2011 14 2011 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $3,732 $25 Not Implemented
SF0398 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,251 $0 Implemented
SF0398 # 02 Y:2011 02 2011 REPAIR AND ELIMINATE STEAM LEAKS $4,412 $0 Implemented
SF0398 # 03 Y:2011 03 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $23,241 $0 Implemented
SF0398 # 04 Y:2011 04 2011 AIR CONDITION ONLY SPACE NECESSARY $4,965 $424 Implemented
SF0398 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $112,927 $56,209 Implemented
SF0398 # 06 Y:2011 06 2011 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $136,531 $212,500 Not Implemented
SF0398 # 07 Y:2011 07 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $975 $2,405 Implemented
SF0398 # 08 Y:2011 08 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,046 $25,868 Not Implemented
SF0398 # 09 Y:2011 09 2011 MINIMIZE WATER USAGE $3,872 $1,867 Not Implemented
OK0810 # 01 Y:2011 01 2011 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $41,808 $12,400 Not Implemented
OK0810 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,840 $11,400 Implemented
OK0810 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,360 $14,062 Not Implemented
OK0810 # 04 Y:2011 04 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,317 $0 Implemented
OK0810 # 05 Y:2011 05 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,915 $0 Not Implemented
GT0882 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,634 $0 Implemented
GT0882 # 02 Y:2011 02 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,201 $0 Not Implemented
GT0882 # 03 Y:2011 03 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $28,143 $70,000 Not Implemented
GT0882 # 04 Y:2011 04 2011 METER WASTE WATER $3,614 $6,000 Not Implemented