Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,529
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0782 # 01 Y:2004 | 01 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $7,120 | $5,800 | Not Implemented |
GT0782 # 02 Y:2004 | 02 | 2004 | BURN A LESS EXPENSIVE GRADE OF FUEL | $9,340 | $2,000 | Not Implemented |
GT0782 # 03 Y:2004 | 03 | 2004 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $7,210 | $3,000 | Not Implemented |
GT0782 # 04 Y:2004 | 04 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,280 | $2,145 | Implemented |
GT0782 # 05 Y:2004 | 05 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,625 | $200 | Implemented |
GT0782 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $540 | $450 | Implemented |
GT0782 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $610 | $2,340 | Implemented |
GT0779 # 01 Y:2004 | 01 | 2004 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,183 | $5,000 | Implemented |
GT0779 # 02 Y:2004 | 02 | 2004 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $590 | $2,700 | Implemented |
GT0779 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,642 | $5,350 | Not Implemented |
GT0779 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $327 | $300 | Implemented |
GT0779 # 05 Y:2004 | 05 | 2004 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,090 | $4,600 | Not Implemented |
GT0779 # 06 Y:2004 | 06 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,561 | $320 | Not Implemented |
GT0779 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $303 | $1,000 | Implemented |
GT0778 # 01 Y:2004 | 01 | 2004 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $6,613 | $33,628 | Not Implemented |
GT0778 # 02 Y:2004 | 02 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,032 | $3,228 | Implemented |
GT0778 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,134 | $100 | Not Implemented |
GT0778 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $927 | $600 | Implemented |
GT0778 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $719 | $600 | Not Implemented |
GT0778 # 06 Y:2004 | 06 | 2004 | CONTROL PRESSURE ON STEAMER OPERATIONS | $5,788 | $13,000 | Not Implemented |
GT0778 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,155 | $9,815 | Not Implemented |
GT0777 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,136 | $0 | Implemented |
GT0777 # 02 Y:2004 | 02 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $14,877 | $800 | Implemented |
GT0777 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,295 | $1,400 | Implemented |
GT0777 # 04 Y:2004 | 04 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,122 | $10,970 | Implemented |