IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,489

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0776 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $330 $83 n/a
GT0776 # 04 Y:2004 04 2004 IMPROVE LUBRICATION PRACTICES $14,283 $0 n/a
GT0776 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,980 $13,020 n/a
GT0776 # 06 Y:2004 06 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $649 $530 n/a
GT0776 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,823 $73,750 n/a
GT0776 # 08 Y:2004 08 2004 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $37,139 $76,240 n/a
GT0776 # 09 Y:2004 09 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,188 $32,362 n/a
GT0776 # 10 Y:2004 10 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,120 $16,200 n/a
GT0776 # 11 Y:2004 11 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,496 $100,000 n/a
GT0775 # 01 Y:2004 01 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,720 $1,559 Implemented
GT0775 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,360 $850 Implemented
GT0775 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $418 $1,559 Not Implemented
GT0775 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $535 $655 Not Implemented
GT0775 # 05 Y:2004 05 2004 UPGRADE OBSOLETE EQUIPMENT $793 $504 Implemented
GT0775 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $296 $980 Implemented
GT0775 # 07 Y:2004 07 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,945 $642 Not Implemented
GT0775 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,211 $3,232 Implemented
GT0775 # 09 Y:2004 09 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $674 $9,444 Implemented
GT0774 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,200 $0 Implemented
GT0774 # 02 Y:2003 02 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,135 $2,700 Not Implemented
GT0774 # 03 Y:2003 03 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $7,977 $2,500 Implemented
GT0774 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $164 $300 Not Implemented
GT0774 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $904 $1,549 Implemented
GT0774 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $290 $200 Implemented
GT0774 # 07 Y:2003 07 2003 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $27,072 $3,660 Not Implemented