Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,474
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0141 # 02 Y:1994 | 02 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,764 | $2,080 | Implemented |
ME0141 # 03 Y:1994 | 03 | 1994 | IMPROVE COMBUSTION CONTROL CAPABILITY | $1,896 | $660 | Not Implemented |
ME0141 # 04 Y:1994 | 04 | 1994 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,292 | $0 | Implemented |
ME0141 # 05 Y:1994 | 05 | 1994 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $619 | $400 | Implemented |
ME0141 # 06 Y:1994 | 06 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $987 | $250 | Not Implemented |
ME0141 # 07 Y:1994 | 07 | 1994 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,764 | $2,150 | Not Implemented |
ME0141 # 08 Y:1994 | 08 | 1994 | REPAIR AND ELIMINATE STEAM LEAKS | $164 | $70 | Implemented |
WI0214 # 01 Y:1994 | 01 | 1994 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $30,762 | $31,200 | Not Implemented |
WI0214 # 02 Y:1994 | 02 | 1994 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $10,026 | $15,000 | Not Implemented |
WI0214 # 03 Y:1994 | 03 | 1994 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $9,933 | $600 | Implemented |
WI0214 # 04 Y:1994 | 04 | 1994 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,450 | $350 | Implemented |
WI0214 # 05 Y:1994 | 05 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,054 | $2,036 | Implemented |
WI0214 # 06 Y:1994 | 06 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $323 | $0 | Not Implemented |
WI0214 # 07 Y:1994 | 07 | 1994 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,682 | $500 | Implemented |
WI0214 # 08 Y:1994 | 08 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,097 | $1,600 | Not Implemented |
WI0214 # 09 Y:1994 | 09 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,642 | $640 | Implemented |
WI0214 # 10 Y:1994 | 10 | 1994 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $384 | $700 | Not Implemented |
WI0214 # 11 Y:1994 | 11 | 1994 | ELIMINATE/REDUCE AN OPERATION | $7,500 | $0 | Not Implemented |
WI0214 # 12 Y:1994 | 12 | 1994 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $2,650 | $2,500 | Not Implemented |
UM0010 # 01 Y:1994 | 01 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,874 | $3,610 | Implemented |
UM0010 # 02 Y:1994 | 02 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,499 | $13,386 | Implemented |
UM0010 # 03 Y:1994 | 03 | 1994 | INSTALL OCCUPANCY SENSORS | $824 | $570 | Not Implemented |
UM0010 # 04 Y:1994 | 04 | 1994 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $163 | $66 | Not Implemented |
UM0010 # 05 Y:1994 | 05 | 1994 | INSTALL / REPAIR INSULATION ON STEAM LINES | $125 | $35 | Implemented |
TN0536 # 01 Y:1994 | 01 | 1994 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $25,358 | $11,960 | Implemented |