IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0141 # 07 Y:1994 07 1994 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,764 $2,150 Not Implemented
ME0141 # 08 Y:1994 08 1994 REPAIR AND ELIMINATE STEAM LEAKS $164 $70 Implemented
NC0034 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,966 $720 Implemented
NC0034 # 02 Y:1994 02 1994 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,677 $210 Implemented
NC0034 # 03 Y:1994 03 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,152 $20 Implemented
NC0034 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $897 $2,500 Implemented
NC0034 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,256 $1,746 Not Implemented
WI0214 # 01 Y:1994 01 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $30,762 $31,200 Not Implemented
WI0214 # 02 Y:1994 02 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $10,026 $15,000 Not Implemented
WI0214 # 03 Y:1994 03 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,933 $600 Implemented
WI0214 # 04 Y:1994 04 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,450 $350 Implemented
WI0214 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,054 $2,036 Implemented
WI0214 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $323 $0 Not Implemented
WI0214 # 07 Y:1994 07 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,682 $500 Implemented
WI0214 # 08 Y:1994 08 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,097 $1,600 Not Implemented
WI0214 # 09 Y:1994 09 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,642 $640 Implemented
WI0214 # 10 Y:1994 10 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $384 $700 Not Implemented
WI0214 # 11 Y:1994 11 1994 ELIMINATE/REDUCE AN OPERATION $7,500 $0 Not Implemented
WI0214 # 12 Y:1994 12 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,650 $2,500 Not Implemented
UM0010 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,874 $3,610 Implemented
UM0010 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,499 $13,386 Implemented
UM0010 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $824 $570 Not Implemented
UM0010 # 04 Y:1994 04 1994 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $163 $66 Not Implemented
UM0010 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $125 $35 Implemented
TN0536 # 01 Y:1994 01 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $25,358 $11,960 Implemented