Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,333
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0234 # 05 Y:2000 | 05 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $3,360 | $300 | n/a |
HO0234 # 06 Y:2000 | 06 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $2,960 | $0 | n/a |
IA0250 # 01 Y:2000 | 01 | 2000 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $1,769 | $593 | Not Implemented |
IA0250 # 02 Y:2000 | 02 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $682 | $1,400 | Implemented |
IA0250 # 03 Y:2000 | 03 | 2000 | INSULATE BARE EQUIPMENT | $1,751 | $2,456 | Implemented |
IA0250 # 04 Y:2000 | 04 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $751 | $0 | Implemented |
IA0250 # 05 Y:2000 | 05 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $579 | $80 | Implemented |
IA0250 # 06 Y:2000 | 06 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $175 | $154 | Not Implemented |
IA0250 # 07 Y:2000 | 07 | 2000 | MOVE PRODUCT USING MECHANICAL MEANS | $11,261 | $16,930 | Not Implemented |
GT0697 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,385 | $46,235 | Implemented |
GT0697 # 02 Y:2000 | 02 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,208 | $4,355 | Not Implemented |
GT0697 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,700 | $37,500 | Not Implemented |
GT0697 # 04 Y:2000 | 04 | 2000 | INSTALL SENSORS TO DETECT DEFECTS | $38,825 | $600 | Implemented |
GT0697 # 05 Y:2000 | 05 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $5,825 | $2,850 | Implemented |
GT0697 # 06 Y:2000 | 06 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,480 | $26,340 | Not Implemented |
GT0697 # 07 Y:2000 | 07 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $19,000 | $3,800 | Implemented |
GT0697 # 08 Y:2000 | 08 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,770 | $900 | Not Implemented |
GT0697 # 09 Y:2000 | 09 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $912 | $2,880 | Implemented |
BD0164 # 09 Y:2000 | 09 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $764 | $0 | Not Implemented |
BD0164 # 10 Y:2000 | 10 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $515 | $300 | Implemented |
BD0164 # 11 Y:2000 | 11 | 2000 | MINIMIZE WATER USAGE | $8,069 | $15,000 | Not Implemented |
BD0164 # 12 Y:2000 | 12 | 2000 | INCREASE USE OF AUTOMATION | $105,120 | $252,000 | Implemented |
BD0164 # 13 Y:2000 | 13 | 2000 | INCREASE USE OF AUTOMATION | $68,990 | $152,000 | Implemented |
BD0164 # 14 Y:2000 | 14 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $14,730 | $24,000 | Not Implemented |
BD0164 # 15 Y:2000 | 15 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $7,800 | $2,000 | Not Implemented |