IAC Assessment: BD0164
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0164
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2000
Principal Product Aluminum Die Castings
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 130,000
Annual Production 3,500,000 Pounds
Production Hrs. Annual 8,760
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $142,929 4,951,055 kWh $0.03
Electricity Demand $89,679 13,311 kW-months/year $6.74
Electricity Fees $341 - $ -
Natural Gas $212,721 59,554 MMBtu $3.57
TOTAL ENERGY COSTS $445,670
RECOMMENDED SAVINGS* $235,622 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $195,778
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (haz) Administrative Changes One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (haz) Administrative Changes One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,121
Cost:
$25,200
- - - - $8,121 2,293 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$8,121
2,293
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,081
Cost:
$11,000
$4,747 164,127 $1,334 198 - - - - - - - - - - - - $4,747
164,127
kWh
$1,334
198
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,013
Cost:
$15,000
$5,013 84,276 - - - - - - - - - - - - - - $5,013
84,276
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,746
Cost:
$1,425
$1,700 58,910 $1,046 155 - - - - - - - - - - - - $1,700
58,910
kWh
$1,046
155
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.2514 COVER OPEN TANKS Savings:
$2,655
Cost:
$3,300
$2,655 74,350 - - - - - - - - - - - - - - $2,655
74,350
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,123
Cost:
$1,000
$1,610 55,686 $513 76 - - - - - - - - - - - - $1,610
55,686
kWh
$513
76
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$927
Cost:
$975
$337 11,723 $108 16 - - - - - - - - $482 - - - $337
11,723
kWh
$108
16
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$482
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$828
Cost:
$750
$482 16,706 $176 26 - - - - - - - - $170 - - - $482
16,706
kWh
$176
26
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$170
-
$
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$764
Cost:
-
$579 19,930 $185 28 - - - - - - - - - - - - $579
19,930
kWh
$185
28
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$515
Cost:
$300
$390 13,482 $125 19 - - - - - - - - - - - - $390
13,482
kWh
$125
19
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
11: 3.4151 MINIMIZE WATER USAGE Savings:
$8,069
Cost:
$15,000
- - - - - - $8,069 57,240 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,069
57,240
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
12: 3.2176 INCREASE USE OF AUTOMATION Savings:
$105,120
Cost:
$252,000
- - - - - - - - - - $105,120 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$105,120
-
$
-
-
$
-
-
$
13: 3.2176 INCREASE USE OF AUTOMATION Savings:
$68,990
Cost:
$152,000
- - - - - - - - - - $68,990 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$68,990
-
$
-
-
$
-
-
$
14: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$14,730
Cost:
$24,000
- - - - - - - - - - $14,730 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$14,730
-
$
-
-
$
-
-
$
15: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$7,800
Cost:
$2,000
- - - - - - - - - - - - - - $7,800 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
$7,800
-
$
16: 4.5150 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$780
Cost:
$100
- - - - - - - - - - - - - - $780 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
$780
-
$
17: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$360
Cost:
$100
- - - - - - - - $360 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$360
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$235,622
Cost:
$504,150
$17,513 499,190 $3,487 518 $8,121 2,293 $8,069 57,240 $360 - $188,840 - $652 - $8,580 - $17,513
499,190
kWh
$3,487
518
kW-months/year
$8,121
2,293
MMBtu
$8,069
57,240
Tgal
$360
-
lb
$188,840
-
$
$652
-
$
$8,580
-
$
TOTAL IMPLEMENTED Savings:
$195,778
Cost:
$437,850
$16,934 479,260 $3,302 490 - - - - - - $174,110 - $652 - $780 - $16,934
479,260
kWh
$3,302
490
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$174,110
-
$
$652
-
$
$780
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (haz) Administrative Changes One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (haz) Administrative Changes One-time Revenue or Avoided Cost Primary Product