IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0549 # 01 Y:2004 01 2004 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $29,210 $116,000 Not Implemented
CO0549 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,000 $27,900 Not Implemented
CO0549 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $6,130 $3,800 Not Implemented
CO0549 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,920 $510 Implemented
CO0549 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,780 $60 Not Implemented
CO0549 # 06 Y:2004 06 2004 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $650 $500 Implemented
CO0549 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $390 $360 Not Implemented
CO0549 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,840 $58,140 Implemented
SD0349 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $78,560 $164,000 Not Implemented
SD0349 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,934 $4,300 Implemented
SD0349 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,757 $920 Implemented
SD0349 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,407 $3,423 Implemented
SD0349 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $1,332 $369 Not Implemented
SD0349 # 06 Y:2004 06 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,780 $18,500 Implemented
MS0258 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $27,618 $3,865 Not Implemented
MS0258 # 02 Y:2004 02 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,390 $2,000 Not Implemented
MS0258 # 03 Y:2004 03 2004 INCREASE AMOUNT OF CONDENSATE RETURNED $17,029 $5,830 Not Implemented
MS0258 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,838 $7,618 Not Implemented
MS0258 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $9,148 $698 Not Implemented
MS0258 # 06 Y:2004 06 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,547 $28,092 Not Implemented
MS0258 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,220 $400 Not Implemented
MS0258 # 08 Y:2004 08 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,706 $211 Not Implemented
MS0258 # 09 Y:2004 09 2004 USE PHOTOCELL CONTROLS $2,197 $556 Not Implemented
MS0258 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,287 $1,192 Not Implemented
MS0258 # 11 Y:2004 11 2004 INSTALL TIMERS AND/OR THERMOSTATS $917 $236 Not Implemented