IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0041 # 03 Y:2010 03 2010 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $5,320 $2,520 Implemented
UA0041 # 04 Y:2010 04 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $216,130 $0 Implemented
UA0041 # 05 Y:2010 05 2010 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $76,495 $0 Implemented
UA0041 # 06 Y:2010 06 2010 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $21,020 $19,015 Not Implemented
UA0041 # 07 Y:2010 07 2010 INSULATE BARE EQUIPMENT $1,020 $2,450 Implemented
UA0041 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,050 $2 Implemented
UA0041 # 09 Y:2010 09 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,310 $22,000 Not Implemented
UA0041 # 10 Y:2010 10 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,050 $7 Not Implemented
UA0041 # 11 Y:2010 11 2010 INSTALL TIMERS AND/OR THERMOSTATS $5,765 $675 Implemented
MS0345 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,308 $7,084 Not Implemented
MS0345 # 02 Y:2009 02 2009 REPAIR AND ELIMINATE STEAM LEAKS $13,965 $187 Implemented
MS0345 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,762 $10,935 Not Implemented
MS0345 # 04 Y:2009 04 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,977 $4,445 Implemented
MS0345 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,379 $462 Implemented
MS0345 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,924 $12,190 Not Implemented
MS0345 # 07 Y:2009 07 2009 USE PHOTOCELL CONTROLS $1,095 $630 Not Implemented
MS0345 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $948 $864 Implemented
MS0345 # 09 Y:2009 09 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $330 $168 Implemented
UA0040 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,523 $37,395 Not Implemented
UA0040 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,360 $35,000 Not Implemented
UA0040 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,762 $1,500 Implemented
UA0040 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,228 $171,697 Implemented
UA0040 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $798 $272 Not Implemented
UA0040 # 06 Y:2009 06 2009 INSULATE BARE EQUIPMENT $3,051 $55 Not Implemented
UA0040 # 07 Y:2009 07 2009 INSTALL TIMERS AND/OR THERMOSTATS $2,586 $1,870 Not Implemented