IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0314 # 01 Y:2017 01 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $8,333 $6,560 Implemented
MI0314 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,727 $1,660 Not Implemented
MI0314 # 03 Y:2017 03 2017 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,444 $3,600 Implemented
MI0314 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,595 $12,009 Implemented
MI0314 # 05 Y:2017 05 2017 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $4,033 $12,706 Not Implemented
MI0314 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,364 $1,125 Implemented
MI0314 # 07 Y:2017 07 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,023 $1,885 Not Implemented
MI0314 # 08 Y:2017 08 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,679 $290 Implemented
MI0313 # 01 Y:2017 01 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,711 $620 Not Implemented
MI0313 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $6,519 $720 Implemented
MI0313 # 03 Y:2017 03 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,171 $1,160 Implemented
MI0313 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,626 $4,300 Not Implemented
MI0313 # 05 Y:2017 05 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,803 $1,580 Not Implemented
MI0313 # 06 Y:2017 06 2017 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,082 $249 Implemented
MI0313 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $992 $3,884 Not Implemented
MI0313 # 08 Y:2017 08 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $992 $1,660 Implemented
MI0313 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $164 $574 Implemented
UF0507 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,676 $1,124 Implemented
UF0507 # 02 Y:2017 02 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,643 $3,762 Implemented
UF0507 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,363 $210 Implemented
UF0507 # 04 Y:2017 04 2017 INCREASE AMOUNT OF CONDENSATE RETURNED $814 $876 Implemented
UF0507 # 05 Y:2017 05 2017 INSTALL AN UNINTERUPTABLE POWER SUPPLY $14,679 $43,710 Not Implemented
UF0507 # 06 Y:2017 06 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,808 $0 Implemented
MI0310 # 01 Y:2017 01 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $66,228 $330,000 Not Implemented
MI0310 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $26,938 $3,600 Implemented