Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0479 # 10 Y:2013 | 10 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,736 | $19,676 | Not Implemented |
WV0479 # 11 Y:2013 | 11 | 2013 | REPAIR OR REPLACE STEAM TRAPS | $4,104 | $6,095 | Implemented |
WV0479 # 12 Y:2013 | 12 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,996 | $595 | Implemented |
WV0479 # 13 Y:2013 | 13 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,332 | $3,845 | Implemented |
WV0479 # 14 Y:2013 | 14 | 2013 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $559 | $50 | Implemented |
LE0368 # 01 Y:2013 | 01 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,192 | $1,280 | Not Implemented |
LE0368 # 02 Y:2013 | 02 | 2013 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $10,077 | $800 | Not Implemented |
LE0368 # 03 Y:2013 | 03 | 2013 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $15,354 | $800 | Not Implemented |
LE0368 # 04 Y:2013 | 04 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $72 | $72 | Not Implemented |
LE0368 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,200 | $1,000 | Not Implemented |
LE0368 # 06 Y:2013 | 06 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $4,569 | $4,320 | Not Implemented |
LE0368 # 07 Y:2013 | 07 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $618 | $500 | Not Implemented |
LE0368 # 08 Y:2013 | 08 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $688 | $1,200 | Not Implemented |
LE0368 # 09 Y:2013 | 09 | 2013 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $12,354 | $0 | Not Implemented |
LE0368 # 10 Y:2013 | 10 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,761 | $61,150 | Not Implemented |
LE0368 # 11 Y:2013 | 11 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,665 | $16,200 | Not Implemented |
LE0368 # 12 Y:2013 | 12 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $21,154 | $64,400 | Not Implemented |
LE0368 # 13 Y:2013 | 13 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,829 | $2,000 | Not Implemented |
LE0369 # 01 Y:2013 | 01 | 2013 | INSTALL OCCUPANCY SENSORS | $8,050 | $19,339 | Implemented |
LE0369 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,100 | $14,365 | Implemented |
LE0369 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,867 | $8,710 | Not Implemented |
LE0369 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,258 | $7,350 | Implemented |
LE0369 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $50,065 | $1,470 | Implemented |
LE0369 # 06 Y:2013 | 06 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $50,836 | $87,600 | Implemented |
LE0369 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,083 | $1,000 | Implemented |