IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0171 # 02 Y:1993 02 1993 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $17,072 $60,040 Not Implemented
ND0171 # 03 Y:1993 03 1993 OPTIMIZE PLANT POWER FACTOR $12,500 $22,673 Not Implemented
ND0171 # 04 Y:1993 04 1993 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $7,558 $8,500 Not Implemented
ND0171 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,000 $1,000 Implemented
ND0171 # 06 Y:1993 06 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,240 $3,890 Not Implemented
ND0171 # 07 Y:1993 07 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,880 $1,290 Not Implemented
ND0171 # 08 Y:1993 08 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,330 $3,655 Not Implemented
ND0171 # 09 Y:1993 09 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,056 $430 Not Implemented
ND0171 # 10 Y:1993 10 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $918 $772 Not Implemented
ND0171 # 11 Y:1993 11 1993 COVER OPEN TANKS $869 $1,002 Not Implemented
ND0171 # 12 Y:1993 12 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $421 $2,020 Not Implemented
ND0171 # 13 Y:1993 13 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $124 $0 Implemented
KU0403 # 01 Y:1993 01 1993 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $997 $2,350 Not Implemented
KU0403 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $867 $240 Implemented
KU0403 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $375 $1,301 Implemented
KU0403 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $262 $200 Implemented
KU0403 # 05 Y:1993 05 1993 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $884 $1,000 Not Implemented
KU0403 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $629 $2,133 Not Implemented
KU0403 # 07 Y:1993 07 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $621 $200 Not Implemented
KU0403 # 08 Y:1993 08 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $153 $551 Implemented
KU0403 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $161 $480 Implemented
OR0180 # 01 Y:1993 01 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,108 $0 Implemented
OR0180 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $12,645 $9,750 Implemented
OR0180 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $388 $1,922 Implemented
MO0096 # 01 Y:1993 01 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,544 $100 Not Implemented